Cse In News

Garbage Mountains – Dotting The Landscape Of Delhi

Ghazipur, Bhalswa and Okhla – the three dumpsites in Delhi have collectively caused nearly Rs. 450 crore in damage to the environment. Can the national capital get rid of dumpsites and manage its waste effectively? New Delhi: Savera was eight when her family migrated to Delhi from Kolkata in search of a better life. Unable to find a good job, her father moved to Ghazipur, close to a “garbage mountain” where they all learned how to collect waste and make a living. “When we climb to the top of the dumpsite, we carry our death in our hands”, says Savera, who is now a 32-year-old fatigued woman with three children. Savera is among hundreds of informal waste collectors who live off the garbage mountain. They secretly enter the Ghazipur dumpsite, spread across 72 acres of land, climb the hills of trash and spend their day segregating waste and collecting valuables, which is essentially waste that can be sold to recyclers to earn some money. As per the information shared by the Municipal Corporation of Delhi, the city generates 11,332 tonnes of Municipal Solid Waste per day. This includes 11,000 TPD (Tonnes Per Day) from the Municipal Corporation of Delhi (East, South and North Delhi Municipal Corporation), 260 TPD generated by the New Delhi Municipal Council and 72 TPD by the Delhi Cantonment Board. “Hundred per cent of the waste generated is collected. Door-to-door collection means the auto tipper which has two main compartments – green for wet waste and blue for dry waste – and a small black box at the back, goes to every house or residential society,” Dinesh Yadav, Chief Engineer at the Department of Environmental Management, at the Municipal Corporation of Delhi (MCD) tells NDTV. MCD has 12 zones with one contractor for each zone. The collected waste goes to Fixed Compactor Transfer Stations (FCTS) – a garbage compressing system that facilitates the transport of garbage to sanitary landfill sites – and Material Recovery Facilities (MRFs) for the recovery of recyclables. What the MRFs collect goes to waste-to-energy plants, for composting, and to dumpsites. According to the Solid Waste Management Rules 2016, waste should be segregated at source but not everyone in Delhi practices it, says Mr. Yadav. Of the 11,332 TPD of fresh waste, 6,078.5 TPD is processed at four waste-to-energy plants, 622.4 TPD is processed at composters, biogas plants, organic waste convertors and compost pits, 271 TPD is recycled through 170 Material Recovery Facilities (MRFs). And the remaining 4,360 TPD is disposed of at the dumpsites. Ghazipur dumpsite is one of the three dumpsites in the national capital Delhi. The other two are Okhla and Bhalswa dumpsites. Dumpsites: Health And Environmental Hazard On April 8, 2016, the Ministry Of Environment, Forest and Climate Change notified the Solid Waste Management Rules 2016 to lay a solid framework for scientific waste management of waste across urban settlements. The rules apply to all sorts of waste generators: households, event organisers, street vendors, Resident Welfare Associations and Market Associations, gated communities having an area of more than 5,000 square metres, and hotels and restaurants. The Solid Waste Management Rules 2016 define “dump sites” as “a land utilised by the local body for the disposal of solid waste without following the principles of sanitary land filling.” Now, what is sanitary landfilling? The rules describe it as, The final and safe disposal of residual solid waste and inert wastes on land in a facility designed with protective measures against pollution of ground water, surface water and fugitive air dust, wind-blown litter, bad odour, fire hazard, animal menace, bird menace, pests or rodents, greenhouse gas emissions, persistent organic pollutants slope instability and erosion. Confused about what this means in layman’s language? “While sanitary landfills are scientific structures or containment systems which are engineered and constructed in a way to isolate waste from the surrounding environment, dumpsites are mere pieces of land without any mechanism for pollution control,” says Dr. Richa Singh, Deputy Programme Manager, MSW (Municipal Solid Waste) team, Centre for Science and Environment. She adds that sanitary landfills have barriers of high-density polyethylene and mechanisms to collect and treat leachate (contaminated liquid generated when water percolates through waste), alongwith the ability to collect landfill gas, which primarily consists of methane and treat that as well. “Living around dump sites comes with health challenges as people in close vicinity are exposed to gases like the colourless and odorless Methane, trace gases like H2S (Hydrogen Sulfide), as well as high levels of Particulate Matter and Ammonia,” says Dr. Singh. These gases are carcinogenic in nature. Long-term exposure to these gases can result in respiratory disorders, and at times it can lead to cancer as well. On dumpsites, while biodegradable or wet waste decomposes over time, the anaerobic decomposition (breakdown of organic waste in the absence of oxygen) of organic waste generates methane gas, which is flammable and generates heat. That’s the reason why dumpsites in Delhi, especially in summer, often catch fire. If not fire, then these are always smoldering in patches, says Dr. Singh. As an interim solution (till the remediation of all the legacy waste is done), a gas collection and treatment system for landfill gases is required. Moreover, landfilling of biodegradable and combustible waste should not be done in the first place to prevent the leachate and landfill gas issue. According to the data received from Delhi Fire Services, between 2019 and 2022, the Department received 33 fire calls each from Bhalswa and Okhla dumpsite and 23 from Ghazipur. In March 2020, the National Green Tribunal (NGT) formed a committee comprising the Central Pollution Control Board (CPCB), National Environmental Engineering Research Institute, and IIT Delhi to prepare a report on the “Assessment of the amount of damage to environment on account of dumpsites in Delhi”. As per the report prepared by the joint committee in January 2021, the three dumpsites have collectively caused nearly Rs. 450 crore in damage to the environment. The study has assessed the ecological damage caused due to Bhalswa dumpsite at Rs 155.9 crore, Okhla at Rs 151.1 crore and Ghazipur at Rs 142.5 crore. Delhi’s Efforts To Clear Up Legacy Waste Currently, these dumpsites appear to be like hills in the middle of a bustling metropolis. The garbage mountains in Ghazipur and Bhalswa continue to receive fresh waste regularly and a strong stench engulfs the surroundings. In an effort to clear up the dumpsite, the waste dumping has stopped at the Okhla site but the other two continue to receive fresh municipal solid waste on a regular basis. The Solid Waste Management (SWM) Rules, 2016 urge local authorities to “investigate and analyse all old open dumpsites and existing operational dumpsites for their potential of biomining and bio-remediation and where ever feasible, take necessary actions to bio-mine or bio-remediate the sites.” The oldest dumpsite in Ghazipur was commissioned in 1984 and crossed the permissible height of 20m in 2002. It has been overflowing since then and stands at around 40 meters, as per the MCD. Similarly, Bhalswa dumpsite, started in 1995, exceeded its capacity in 2006 and Okhla dumpsite commissioned in 1996 was declared exhausted in 2010. As per the data received from the MCD, 280 lakh tonnes of legacy waste has been dumped on the three dumpsites as of July 2019, with 140 lakh tonnes on the Ghazipur site alone. The three dumpsites in Delhi have been ticking time bombs with burgeoning waste. Keeping up with the SWM Rules, the MCD decided to opt for bio-mining of legacy waste. On November 3, 2022, the MCD awarded tenders to three companies to process and dispose of 30 lakh tonnes of legacy waste at each of the three sites in 18 months that is by May 2024. When this target is met, the contract will be renewed for additional 15 lakh MTs. Sudhakara Infratech is responsible for managing legacy waste at Ghazipur, GreenTech Environ Management for the Okhla site and Alfa Therm Limited for Bhalswa. “In our agreement, there is an incentive mechanism. If any of the contractors achieve the bio-mining target before the deadline, they will be incentivised,” Mr. Yadav told NDTV. The three companies have adopted tromelling – the process of sieving the waste through trommel machines and segregating it into three categories – to sort the legacy waste. Team Banega Swasth India visited the Okhla dumpsite where 40.88 per cent (24.53 lakh tonnes) of the legacy waste (45 lakh tonnes) has been bio-mined as on January 31, 2023. “The first step is to bio-remediate the waste by using bio-culture. This is to decompose the wet waste. Following this, we practice bio-mining using Klemen screening machines we have got from Germany,” says Ramakant Burman, CEO of GreenTech Environ Management. Trommels are used to segregate waste into three categories – inert waste, construction and demolition (C&D) waste, and a segregated combustible fraction (SCF). At Okhla dumpsite, 80-85 per cent of the legacy waste is inert which is being utilised by the National Highways Authority of India (NHAI) in various road construction projects. Industries having boilers compatible with a segregated combustible fraction (SCF) take that waste to use as fuel. The C&D waste is being utilised in construction industries. “It’s a waste to wealth project,” says Mr. Burman with pride. Mr. Yadav from MCD said that the long-term plan is to reclaim the land by clearing up all three dumpsites and eventually convert it into sanitary landfills. Since 2019, a total of 69.64 lakh tonnes of legacy waste has been bio-mined at three sites. This means 24.87 per cent of the 280 lakh tonnes of waste dumped has been removed as on January 31, 2023. If all three contractors achieve the target of removing 90 lakh tonnes collectively by May 2024, even then roughly half of the piled up waste will remain on these sites to be addressed. And not to forget that the dumping of fresh waste on a daily basis will continue. According to the calculations done by Dr. Singh, Delhi will require five to six years to remediate legacy waste. “The cumulative installed capacity of the trommels at Delhi’s dumpsites is reportedly 22,000 tonnes per day. If we consider that there are nearly 245 working days in a year (excluding three months of monsoons), to clear 280 lakh tonnes of legacy waste (dumped as of July 2019), Delhi will require five to six years to remediate all three sites provided that no fresh waste is getting dumped there,” Dr. Singh says. However, the Delhi government is being ambitious about clearing all the dumpsites as early as possible. The state government is targeting to remove the three garbage mountains in two years and is offering Rs. 850 crore for flattening the sites. During the Delhi Government’s budget presentation on March 22, Finance Minister Kailash Gahlot announced the ambitious deadline for clearing all three dumpsites by the end of 2024. He said that the Okhla dumpsite will be removed by December 2023, Bhalswa by March 2024 and Ghazipur by December 2024. Interestingly, the Delhi government, led by Aam Aadmi Party (AAP), fought the MCD elections in December 2022 on the promise of clearing up all three dumpsites. Now that AAP has won the municipal elections and is in control of MCD, NDTV asked an AAP representative about the plan to clear up the garbage and what is needed in terms of resources and infrastructure to get rid of the legacy waste. “There is no magic bullet. All of our urban centers are going through a big crisis of waste,” says Reena Gupta, Advisor, Government of Delhi. “We have to follow three steps – reduce the amount of waste we generate, segregate and dispose of properly.” Ms. Gupta says even though she segregates her waste, the moment it is collected by a waste picker, it gets mixed. The way the contracts are designed, companies that collect waste get paid by weight. It is in the contractor’s interest to mix wet and dry waste and increase the weight of the waste collected. So, the first thing we are going to do is to look at all the contracts signed by erstwhile three MCDs (East, North, South). The key is segregation and decentralised management of waste. This means, the first level of waste segregation has to happen at the household or waste generation level. Then after collection at the Resident Welfare Association (RWA) level and then at the ward level, another round of segregation needs to be practised. If we practice waste segregation, wet waste, which is, biodegradable in nature, can be composted or converted into biogas. “The ultra-pure form of biogas is bio CNG, which is practised by Indore, India’s cleanest city, as per Swachh Survekshan. Dry waste can be recycled. For now, sanitary waste can be sent to bio-medical waste incinerators. And, domestic hazardous waste to common hazardous waste management facilities”, says Dr. Singh. In the process, rejects like drain silt, road dust, or residue solid waste, which doesn’t have any value – only that should be disposed of, ideally into the sanitary or engineered landfill. NDTV’s Banega Swasth India team asked Delhi Chief Minister, Arvind Kejriwal about the lack of implementation of the segregation at source in Delhi, something that is mandated under SWM rules. “Waste segregation should happen at the source and at the household level. Segregation isn’t practised by some households as it is difficult to overnight change the culture of a city. The waste is segregated after being picked up from the households,” said CM Kejriwal. “We plan to create composting area in the MCD parks so that the person who comes to collect garbage or even individuals and RWAs, have a place where they can give waste for composting. A lot of training needs to happen – training of RWAs, mobilisation of citizens of Delhi, so that we get it in our culture that we have to reduce, compost and recycle,” says Ms Gupta. She further added, “Importantly, we have to create scientific landfill sites. There is no place in Delhi.” The Urgency To Clear Up Dumpsites On March 3, Delhi Chief Minister Arvind Kejriwal visited the Okhla dumpsite to take stock of the legacy waste clearing up work. “The bio-mining capacity at Okhla stands at 17,000 MT but we can dispose of only 4,000-4,500 MT of waste daily. As a result of this, we are unable to utilise the bio-mining capacity at full strength. From April, the waste disposal capacity will be increased to 10,000 MT and 15,000 MT from June. With increased capacity, we will be able to meet our deadline by December or January,” he said. On March 16, CM Kejriwal also visited the Bhalswa dumpsite where he said that of the 80 lakh tonnes of waste dumped at Bhalswa, 30 lakh tonnes have been cleared over the last two and a half years or so. By December 2023, another 30 lakh tonnes of waste will be removed and the remaining by March-April 2024. He added, The initial target was to remove 6,500 tonnes of waste per day, but on Wednesday (March 15), 9,000 tonnes was removed. By the end of this month, 12,000 tonnes of waste will be removed every day. Additionally, the major focus of the Swachh Bharat Mission (Urban) 2.0 [SBM (U) 2.0] launched on October 1, 2021, is to make cities garbage-free. SBM-U 2.0 focuses on solid waste management through segregation at the source and management of garbage through scientific processes, like dumpsite remediation that is the removal of waste that has accumulated on dumpsites over the years. Under this plan, 2026 is the deadline to remediate all legacy dumpsites. Waste Workers Brigade Living Off Dumpsites As Delhi tries to reduce the discarding of fresh waste on dumpsites and transit to technologies like Waste to Energy (WTE) plants, what will happen to the people who live off these mountains of garbage? For instance, the waste collected from the East Zone used to go to the Ghazipur dumpsite but a huge chunk has been diverted to the Waste to Energy plant in Okhla. This has resulted in the loss of livelihood for people living around the dumpsite. “As a kid, I would find and collect plastic, steel, metal and other valuable items from the garbage,” says Savera. “The waste coming here has been reduced by over 60 per cent. Earlier we would earn Rs. 500 to Rs. 600 a day, but now it is a challenge to earn Rs. 500 in two days.” Now that her family income has halved, Savera is clueless about where to go in search of work. She still makes a trip to the dumpsite with the hope of finding some waste of value. Saddened by the proposed closure of the dumpsite, she says, The government should have provided us an alternative source of livelihood. We are poor. We don’t have savings. Team Banega Swasth India asked CM Kejriwal about his government’s plan to provide an alternative source of livelihood for waste workers. He said, I don’t think there is any systematic plan. Let me find out.

Air quality fails to mirror 35% dip in vehicle growth in Delhi

The number of registered vehicles in Delhi plummeted 35.4% in 2021-22 from the previous year. This should have had a salubrious effect on the city’s air quality given that vehicular emission is a major air pollutant. But there was no significant impact on PM2.5 levels, leaving experts to explain that lower registration did not mean fewer vehicles on the roads. Track the pollution level in your city The Economic Survey of Delhi released on Monday said the total number of vehicles on the road reduced because the state government banned petrol and diesel vehicles that had lived out their stipulated lives of, respectively, 15 years and 10 years. Experts pointed out that the fewer registration of vehicles in Delhi did not mean reduction in their usage. Delhi air pollution_1280 Chandra Bhushan, CEO, International Forum for Environment, Sustainability and Technology (iForest), noted, “Over the years, new vehicles were being registered but the old vehicles weren’t being taken off the roads. This is just cleaning up the registration data. Of the total 43.6 lakh deregistered vehicles, 29.7 lakh, or around 69%, were two-wheelers. Only 13.1 lakh vehicles were cars and four wheelers. Besides, the 10- and 15- year-old vehicles going off the road will have a marginal impact on air quality.” Amit Bhatt, managing director (India), International Council on Clean Transportation, pointed out, “The Economic Survey said there was a drop in vehicle registration after the deregistration of old vehicles. However, there is no information on how many vehicles are running in the city as the data only pertains to cumulative registration of motor vehicles.” Bhatt said the decrease in the number of registered vehicles in Delhi did not necessarily indicate a reduction in usage. “Transportation is a significant contributor to air pollution. With the recent increase in motor vehicle sales and traffic congestion, there has been a corresponding rise in transport emissions,” he said. However, Anumita Roychowdhury, executive director, research and advocacy, Centre for Science and Environment, felt that the impact of the phasing out of old vehicles was showing up in the survey. “The numbers have been corrected based on deregistration and scrappage. This reduction may have lessened exposure to toxic emissions from vehicles to some extent. But this is likely to be a temporary dent,” she said. Roychowdhury added that the number of personal vehicles — cars and two wheelers — having grown steadily until the pandemic is now likely to see a rebound effect after the temporary dip. “This is mainly because the public transport ridership is declining.” Officials of the transport department did not respond to TOI’s calls and messages.

दिल्ली में अक्षय ऊर्जा को बढ़ावा देने के लिए ‘सामूहिक सौर पैनल’ के प्रोत्साहन पर ज़ोर

दिल्ली सरकार ने साल 2022 की अपनी हालिया ड्राफ्ट सोलर पॉलिसी में प्रस्ताव रखा था कि जिन लोगों के पास सोलर लगवाने का विकल्प या उसके लिए जगह नहीं है उनके लिए सामुदायिक सोलर योजना अपनाई जाए। दिल्ली की साल 2016 की नीति में साल 2020 तक छतों पर सोलर से 1000 मेगावाट बिजली पैदा करने का लक्ष्य रखा गया था। हालांकि, अभी तक सिर्फ 230 मेगावाट का ही लक्ष्य पूरा हो पाया है। विशेषज्ञों का कहना है कि घरेलू छतों पर सोलर लगाने की योजना में आकर्षक इन्सेन्टिव की कमी है। इसके अलावा, मौजूदा फ्री बिजली योजना की वजह से सोलर सिस्टम की तरफ ग्राहक उदासीन हैं। राष्ट्रीय राजधानी दिल्ली ने साल 2016 में आई अपनी आखिरी सोलर नीति में ऐलान किया था कि साल 2020 के अंत तक रूफटॉप सेटअप यानी लोगों के घरों की छतों पर सोलर पैनल लगाकर 1000 मेगावाट बिजली सौर ऊर्जा से पैदा की जाएगी। हालांकि, दिल्ली सरकार के मुताबिक, छतों पर सौर ऊर्जा से अभी तक 230 मेगावाट बिजली पैदा की जा रही है। यह उस लक्ष्य के 25 प्रतिशत से भी कम है जिसे 3 साल पहले हासिल कर लिया जाना चाहिए था। ग्राहकों और कंपनियों को इन्सेन्टिव दिए जाने और 500 वर्ग मीटर की छत वाली सरकारी इमारतों पर सोलर पैनल लगाना अनिवार्य किए जाने के बावजूद इतना ही लक्ष्य हासिल किया जा सका है। अभी 2016 की नीति का 1000 मेगावाट का लक्ष्य पूरा नहीं हो सका है लेकिन दिल्ली सरकार अपनी नई ड्राफ्ट सोलर पॉलिसी 2022 ले आई है। इस नीति के तहत छतों पर लगाए जाने वाले सोलर में बढ़ोतरी की जानी है। इस पॉलिसी का लक्ष्य है कि छतों पर लगे सोलर की क्षमता को बढ़ाकर 750 मेगावाट तक पहुंचाना है और दिल्ली के बाहर के यूटिलिटी स्केल सोलर प्रोजेक्ट के तहत 5,250 मेगावाट क्षमता जोड़ी जानी है और इस तरह अगले 3 सालों में यानी 2025-26 तक सौर ऊर्जा की क्षमता को बढ़ाकर 6,000 मेगावाट तक पहुंचाना है। यह नीति कहती है कि फिलहाल दिल्ली में वार्षिक ऊर्जा जरूरतों का सिर्फ 9 प्रतिशत हिस्सा छतों पर लगाए गए सोलर और यूटिलिटी स्केलर सोलर से मिलता है। नई नीति की योजना है कि 2025 के अंत तक इस वार्षिक ऊर्जा खपत में इस हिस्सेदारी को बढ़ाकर 25 प्रतिशत तक पहुंचाया जाए। इस नीति का लक्ष्य है कि 2025 के आखिर तक कोयले से बानी बिजली यानी थर्मल एनर्जी से ज्यादा सौर ऊर्जा की हिस्सेदारी हो जाए। सरकार सामुदायिक सोलर रूफटॉप की अवधारणा भी लाई है जिसमें वो लोग, जो फ्लैट या अपार्टमेंट में रहते हैं या जिनकी छत छोटी है, साथ आकर किसी एक जगह पर सोलर पैनल लगवा सकते हैं और अपने-अपने निवेश के हिसाब से सौर ऊर्जा का फायदा ले सकते हैं। यह सबकुछ ग्रुप नेट-मीटरिंग या वर्चुअल मीटरिंग की मदद से संभव किया जा सकता है। सरकार का दावा है कि इस नीति के तहत घरेलू ग्राहकों को सहायता भी दी जा रही है ताकि रूफटॉप सोलर लगाने के लिए आने वाले बड़े खर्च से बचा जा सके। इसके लिए, ग्राहकों को रीन्यूएबल एनर्जी सर्विस कंपनी (RESCO) मॉडल से मदद दी जाती है। इस मॉडल में सोलर प्लांट कोई कंपनी लगाती है और ग्राहकों के घर या अन्य जगहों पर सोलर प्लांट लगाने का खर्च वही उठाती है, इसके बदले वह तय पैसे लेती है। अब इस नीति में RESCO मॉडल का हाइब्रिड वर्जन प्रस्तावित है। इसमें सोलर डेवलपर्स और डिस्कॉम के बीच पॉवर परचेज एग्रीमेंट (PPA) या विद्युत क्रय अनुबंध किया जाएगा और ग्राहक और डिस्कॉम के बीच नेट-मीटरिंग एग्रीमेंट किया जाएगा। इस नीति के तहत, दिल्ली सरकार यह दावा भी करती है कि वह निजी और व्यावसायिक ग्राहकों के लिए 500 मेगावाट तक के पहले डेप्लॉयमेंट के लिए जेनरेशन-बेस्ड इन्सेंटिव दे रही है। इसके अलावा, घरेलू ग्राहकों को मदद भी दी जा रही है। इस नीति के तहत, बिना किसी खर्च के अपनी छत पर सोलर लगवाने का असेसमेंट कराया जा सकता है। इसमें, ग्राहक एक सोलर कार्ड रिपोर्ट/सोलर स्कोर बनवा सकता है जो किसी घर की छत या अन्य जगह पर सोलर रूफटॉप की संभावना के बारे में बताता है। रूफटॉप सोलर में बढ़ोतरी की उम्मीद इस क्षेत्र में काम करने वाले विशेषज्ञों का कहना है कि नई ड्राफ्ट पॉलिसी 2022 में कुछ बातें ऐसी हैं जो इस सेक्टर को प्रेरणा देंगी। सेंटर फॉर साइंस एंड एनवायरनमेंट (CSE) में रीन्यूएबल एनर्जी के डिप्टी प्रोग्राम मैनेजर बिनीत दास ने मोंगाबे-इंडिया से कहा कि दिल्ली के सामने सोलर रूफटॉप लगाने के लिए कुछ समस्याएं हैं, जैसे घरेलू ग्राहकों को इसके लगवाने के लिए ज्यादा खर्च, रूफटॉप सोलर लगाने के लिए मिलने वाली सब्सिडी का देरी से मिलना और शहर में सोलर लगवाने वाले ग्राहकों की संख्या बढ़ने से डिस्कॉम कंपनियों की आमदनी में कमी आना। वह कहते हैं कि राजधानी दिल्ली में कमर्शियल और इंडस्ट्रियल जगहों पर लोगों ने ज्यादा बिजली की मांग को पूरी करने के लिए सोलर प्लांट लगवाए हैं ताकि बिजली का बिल कम किया जा सके। बिनीत दास ने मोंगाबे इंडिया से कहा, “नई पॉलिसी में ‘हाइब्रिड RESCO मॉडल’ जैसे कुछ समाधान भी हैं जिसमें सोलर डेवलपर्स (RESCO) ग्राहकों के घरों की छतों पर सोलर रूफटॉप लगाते हैं और डिस्कॉम कंपनियों से संपर्क रखते हैं। इसमें सीधे ग्राहकों को बिजली देने के बजाय ये सोलर डेवलपर एक PPA के जरिए डिस्कॉम कंपनियों को बिजली बेचते हैं। ग्राहक इसके बदले बिजली कंपनियों को पैसे चुकाते हैं और अपने बिजली पर उन्हें मीटरिंग बेनिफिट मिलते हैं। इसमें डेवलपर के चुनाव और बिजली का रेट तय करने का काम पूरी तरह से डिस्कॉम कंपनियों का होता है। इससे डिस्कॉम कंपनियों और ग्राहकों दोनों को फायदा होगा।” उन्होंने यह भी कहा कि नई नीति के तहत घरेलू ग्राहकों को जेनरेशन बेस्ड इन्सेन्टिव या बिजली उत्पादन के आधार पर दिए जाने वाले इनाम का प्रस्ताव एक बार मिलने वाली सब्सिडी की तुलना में सरकार के लिए काफी सस्ता और प्रभावी है। साल 2016 में आई पिछली नीति की में पैदा की जाने वाली बिजली के लिए जेनरेशन-बेस्ड इन्सेन्टिव 2 रुपये प्रति यूनिट था। नई नीति में इसे बढ़ाकर अधिकतम 3 किलोवाट क्षमता वाले सोलर रूफटॉप प्लांट लगाने वाले लोगों के लिए 3 रुपये प्रति यूनिट कर दिया है। यह इन्सेन्टिव ग्राहकों के घर पर सोलर प्लांट से पैदा हुई बिजली के आधार पर दिया जाता है। बिनीत दास आगे कहते हैं, “सोलर प्लांट लगाना और उससे बिजली पैदा काफी कठिन काम है। कई बार तो रख-रखाव खराब होने की वजह से कई सोलर प्लांट बिजली पैदा नहीं कर पाते हैं लेकिन अगर उनके लिए हर यूनिट के हिसाब से सब्सिडी दी जाए तो सोलर प्लांट लगाने वाले लोगों को इसका रख-रखाव बेहतर करने और ज्यादा बिजली पैदा करने में प्रोत्साहन मिलेगा और इससे दिल्ली में सोलर प्लांट्स से बिजली का उत्पादन बढ़ेगा।” इन इन्सेन्टिव के अलावा, यह नीति सौर ऊर्जा पर टैक्स और शुल्क में छूट दिए जाने पर भी चर्चा की गई है। अन्य विशेषज्ञों का कहना है कि दिल्ली के लिए ‘सामुदायिक सोलर’ काफी हद तक नया है। राष्ट्रीय राजधानी दिल्ली की तरह ही भारत के ज्यादातर राज्य ऐसे हैं जहां शहरी इलाकों में जनसंख्या काफी ज्यादा है और वहां बिजली की मांग भी बहुत ज्यादा है। आंकड़ों के मुताबिक, दिल्ली में राष्ट्रीय औसत की तुलना में प्रति व्यक्ति बिजली की मांग ज्यादा है। सेंटर फॉर एनवायरनमेंट एंड एनर्जी डेवलपमेंट (CEED) में क्लीन एनर्जी के हेड अश्विनी अशोक ने मोंगाबे इंडिया से कहा कि कम्युनिटी सोलर रूफटॉप योजना कई ऐसे लोगों की बिजली की जरूरतों को पूरा कर सकती है जो निजी जगहों की कमी की वजह से सोलर रूफटॉप लगा नहीं सकते या अभी तक वे सोलर नहीं लगवा पाए हैं। इस तरह के ग्राहकों में अपार्टमेंट या प्लैट में रहने वाले लोग, कई मंजिला इमारतों में रहने वाले लोग या छोटी जगहों में बिना पक्की छतों वाले घरों या झुग्गियों में रहने वाले लोग शामिल हैं। अशोक कहते हैं कि अगर इस पॉलिसी को अच्छे से लागू किया जाए तो इससे दिल्ली में रूफटॉप सोलर से बिजली का कुल उत्पादन काफी बढ़ाया जा सकता है। अशोक इस नई नीति को लागू करने में आने वाली चुनौतियों के बारे में भी चर्चा करते हैं। वह कहते हैं, “दिल्ली में सौर ऊर्जा को हमेशा से सरकार की 100 यूनिट हर महीने मुफ्त बिजली योजना से कड़ी चुनौती मिलती है। ऐसी बिजली का फायदा उठा रहे ग्राहक मुश्किल से ही तैयार होते हैं कि वे सोलर प्लांट लगाने का इतना भारी भरकम खर्च उठा सकते हैं। इस नीति के तहत राजधानी दिल्ली की सरकार काफी आकर्षक इन्सेन्टिव भी नहीं देती है। इसके अलावा, छोटे घरों के लिए मिलने वाला जेनरेशन बेस्ड इन्सेन्टिव भी काफी मामूली है और वह सिर्फ पांच सालों के लिए सीमित है जबकि ऐसे सोलर प्लांट से 25 सालों तक बिजली पैदा की जा सकेगी। ज्यादातर लोग तो इस सब्सिडी के लिए योग्य ही नहीं माने जाएंगे। अगर हम दिल्ली में रूफटॉप सोलर को बढ़ाना चाहते हैं तो हमें इन्सेन्टिव को बढ़ाना होगा और लागत पर भी छूट देनी होगी क्योंकि ग्राहक वही चाहते हैं।” उन्होंने यह भी कहा कि 2016 की नीति में कागजों पर दर्ज होने के बावजूद RESCO मॉडल घरेलू ग्राहकों को लुभाने में नाकामयाब रहा है क्योंकि सोलर डेवलपर्स को छोटे यूनिट्स के लिए यह मॉडल वित्तीय रूप से ठीक नहीं लगता है। यह मॉडल औद्योगिक क्षेत्र और सामाजिक क्षेत्र में क्लीन एनर्जी प्रोजेक्ट जैसे कि केंद्र सरकार की सोलर-सिंचाई योजना PM-KUSUM तक ही सीमित रहा है। कम जगह और बड़े स्तर के सोलर प्रोजेक्ट्स के अभाव में दिल्ली अब सौर उर्जा जरूरतों को पूरा करने के लिए सोलर रूफटॉप योजना पर फोकस कर रही है। साल 2022 की ड्राफ्ट पॉलिसी के मुताबिक, ज़्यादातर बड़े सोलर प्रोजेक्ट (5250 मेगावाट तक) दिल्ली से बाहर लगने वाले प्रोजेक्ट की मदद से चालू किए जाएंगे। इसका मतलब है कि सोलर प्लांट की मदद से पैदा की गई बिजली दूसरे राज्यों से आयात की जा सकेगी, ठीक उसी तरह जैसे पिछले कई सालों से दिल्ली में बिजली दूसरे राज्यों से आ रही है। दिल्ली का एनर्जी ट्रांजिशन हाल ही में फ़िनलैंड की लाप्पिनरांटा-लाहटी यूनिवर्सिटी ऑफ़ टेक्नोलॉजी (LUT) यूनिवर्सिटी के शोधकर्ताओं ने दिल्ली में बिजली के ट्रांजिशन पर एक रिसर्च की है। इस रिसर्च में पता चला है कि अगर दिल्ली में साल 2050 तक पॉलिसी अपना सबसे बेहतरीन प्रदर्शन करे और 100 प्रतिशत ट्रांजिशन का इस्तेमाल करे तो दिल्ली सबसे ज्यादा बिजली सौर ऊर्जा से मिलने वाली बिजली से लेगी और इसमें सबसे ज्यादा हिस्सा उन लोगों का होगा जो खुद बिजली बनाकर उसका इस्तेमाल कर रहे होंगे। इसके अलावा, कुछ बिजली राजस्थान और हिमाचल प्रदेश जैसे अक्षय ऊर्जा के धनी राज्यों से भी मिलेगी। इस स्टडी के सह-लेखक मनीष राम ने मोंगाबे इंडिया को बताया कि दिल्ली में जगह की कमी के चलते, बड़ी क्षमता वाले सोलर प्लांट नहीं बनाए जा सकते और इसीलिए सोलर रूफटॉप और इसके ग्राहकों में बढ़ोतरी आने की भरपूर संभावना है। दिल्ली सरकार की 2016 की नीति के मुताबिक, दिल्ली में सूरज की अच्छी रोशनी वाले दिन 300 से ज्यादा होते हैं। इससे घरों की छतों पर लगे सोलर पैनल से साल भर में 2500 मेगावाट से ज्यादा बिजली पैदा की जा सकती है। इसमें लोगों की घरों पर लगने वाले सोलर पैनल से 49 प्रतिशत, सरकारी दफ्तरों से 26 प्रतिशत और कमर्शियल और इंडस्ट्रियल यूनिट्स से 25 प्रतिशत बिजली पैदा की जा सकती है। मनीष राम ने मोंगाबे इंडिया से बातचीत में कहा, “ऐसी स्थितियों में दिल्ली के लिए सबसे बेहतर विकल्प यही है कि वह घरेलू और व्यावसायिक इमारतों की छतों का भरपूर इस्तेमाल करे। अभी भी दिल्ली में ज्यादातर बिजली दूसरे राज्यों से ही आती है और भविष्य में भी यही जारी रहने की संभावना है। दिल्ली आने वाले समय में राजस्थान, हरियाणा और आसपास के इलाकों में सोलर पावर प्लांट लगाने के लिए निवेश कर सकती है और उनके साथ PPA साइन करके ‘क्लीन एनर्जी मिक्स बास्केट’ को बढ़ा सकती है। राजस्थान जैसे रीन्यूएबल एनर्जी के मामले में धनी राज्यों में क्लीन एनर्जी पैदा करने का खर्च दिल्ली की तुलना में कम है। ऐसे इलाकों का दिल्ली फायदा उठा सकती है।”

India can show the world how water management can be reinvented: CSE

“Even as the United Nations has launched a global campaign called ‘Be the Change’ to mark the World Water Day, India is already showcasing real action on the ground. It is already holding up a picture of how big change is possible. And this is evident in the way states like Uttar Pradesh are tackling the challenge of providing sustainable and inclusive sanitation and water for all,” said Sunita Narain, director general, Centre for Science and Environment (CSE), while speaking at a national workshop organised here today to mark the World Water Day. Speaking on the occasion, Arvind Kumar Sharma, Minister of urban development, Uttar Pradesh, said: “The World Water Day and our deliberations and discussions on this day are important because we are living today in a time of great crisis in terms of water – a crisis of availability and access, of quality, of lack of sanitation and proper wastewater management, and upsetting of the water cycle due to climate change.” Uttar Pradesh chief secretary Durga Shankar Mishra, who addressed the workshop as well, said: “There is no ‘waste’ water – we only have ‘used’ water. Reduce, reuse and recycle should be the mantra of our life. We need to treat and reuse all water. Since 2014, India has remained committed and on course to a paradigm change in water and sanitation management – sanitation is a public movement in our country today.” The other key speakers at the event were Kaushal Kishore, Union minister of state, ministry of housing and urban affairs; Amrit Abhijat, principal secretary, department of urban development, government of Uttar Pradesh; Neha Sharma, state mission director-SBM, government of Uttar Pradesh; Ranjan Kumar, state mission director-AMRUT, government of Uttar Pradesh; Anil Dhingra, managing director, UP Jal Nigam (urban); Prasanta K Mohapatra, engineer-in-chief, Odisha Water Supply and Sewerage Board; and Depinder Singh Kapur, programme director-water, CSE. On this occasion, CSE released a series of reports based on ground studies on water and sanitation management in Uttar Pradesh The scenario in Uttar Pradesh Uttar Pradesh is the most populous state of India; 95 per cent of its cities and towns are totally dependent on non-sewered sanitation systems. Only 31 towns (out of the 734 in the state) have partial sewerage systems that manage to treat just 40 per cent of the sewage generated. Says Depinder Kapur from CSE: “This is the reason why sustainable and inclusive scientific management of faecal sludge and septage is a priority for UP. The state’s poor are largely dependent on on-site sanitation systems — therefore, providing an effective and affordable septage management system will generate significant social, environmental and public health outcomes.” According to Subrata Chakraborty, senior programme manager-water, CSE, “Uttar Pradesh has been moving ahead towards its goal of promoting inclusive sanitation for all. A septage management policy is in place, 59 towns and cities have set up treatment systems, and with the support provided by Centre for Science and Environment (CSE), the towns of Bijnor and Chunar now have fully functional faecal sludge and co-treatment systems in place.” There are 62 FSSM projects in UP (40 FSTPs and 22 co-treatment plants) — out of this, 36 plants (27 FSTPs and nine co-treatment plants) are fully completed and ready to begin operations as of February 2023. The installed and under-construction capacity of UP’s septage treatment infrastructure stands at 2,075 kilolitre per day (KLD). The state has committed to establishing a network called “Super 59 Faecal Sludge Management Towns”, as the first step of a long term strategy to promote inclusive sanitation. From the workshop… Speaking on the inaugural day of the workshop, Kaushal Kishore underlined the emphasis that the Central government has been giving to water and sanitation issues. Water harvesting, groundwater recharge, rejuvenation of water bodies, and the importance of the role played by sanitation workers were some of the key thrust areas that his ministry was focusing on, he said. In her address on the second day of the workshop, Narain pointed out that India’s “experience has been invaluable in teaching the world how water management can be reinvented so that it is affordable and sustainable”. The ‘Indian way’, she said, puts water in the hands of communities and is focused on decentralised recharge and reuse. “Making water everybody’s business is the only way ahead. This is the opportunity – in this decade, we can put all we have learnt into practice and turn around the water-story of India,” said Narain. Narain pointed out that this was “even more important in today’s climate-risked world. We must scale up our work to invest in water systems and make them durable, not just to withstand another rain, but another deluge. We need to speed up our work, because climate change will make sure that we have more rain, but in fewer rainy days. This means doing much more to capture the rain, when and where it falls so that groundwater is recharged.” She added: “For a country like India, the issue of water is not about scarcity but about its careful use and about its equitable and distributed access. How we manage our water resources would determine if we remain poor or become rich; diseased or healthy. In other words, water is the determinant of our future. Water management strategies will need to be carefully designed so that they lead to distributed wealth generation.” (A CSE Media Briefing) (Report sent by Pratyusha Mukherjee)

'Community Participation न होने की वजह से हमने हर बार Slippage देखा है'- सुष्मिता सेनगुप्ता (सीनियर प्रोग्राम मैनेजर ऑफ वाटर प्रोग्रामिंग, CSE)

'Community Participation न होने की वजह से हमने हर बार Slippage देखा है'- सुष्मिता सेनगुप्ता (सीनियर प्रोग्राम मैनेजर ऑफ वाटर प्रोग्रामिंग, CSE)

Garbage Mountains – Dotting The Landscape Of Delhi

Ghazipur, Bhalswa and Okhla – the three dumpsites in Delhi have collectively caused nearly Rs. 450 crore in damage to the environment. Can the national capital get rid of dumpsites and manage its waste effectively? New Delhi: Savera was eight when her family migrated to Delhi from Kolkata in search of a better life. Unable to find a good job, her father moved to Ghazipur, close to a “garbage mountain” where they all learned how to collect waste and make a living. “When we climb to the top of the dumpsite, we carry our death in our hands”, says Savera, who is now a 32-year-old fatigued woman with three children. We don’t know by the end of the day whether we will come back alive or not. All we know is that we have to take money home for our kids and put food on the table. Savera is among hundreds of informal waste collectors who live off the garbage mountain. They secretly enter the Ghazipur dumpsite, spread across 72 acres of land, climb the hills of trash and spend their day segregating waste and collecting valuables, which is essentially waste that can be sold to recyclers to earn some money. As per the information shared by the Municipal Corporation of Delhi, the city generates 11,332 tonnes of Municipal Solid Waste per day. This includes 11,000 TPD (Tonnes Per Day) from the Municipal Corporation of Delhi (East, South and North Delhi Municipal Corporation), 260 TPD generated by the New Delhi Municipal Council and 72 TPD by the Delhi Cantonment Board. “Hundred per cent of the waste generated is collected. Door-to-door collection means the auto tipper which has two main compartments – green for wet waste and blue for dry waste – and a small black box at the back, goes to every house or residential society,” Dinesh Yadav, Chief Engineer at the Department of Environmental Management, at the Municipal Corporation of Delhi (MCD) tells NDTV. MCD has 12 zones with one contractor for each zone. The collected waste goes to Fixed Compactor Transfer Stations (FCTS) – a garbage compressing system that facilitates the transport of garbage to sanitary landfill sites – and Material Recovery Facilities (MRFs) for the recovery of recyclables. What the MRFs collect goes to waste-to-energy plants, for composting, and to dumpsites. According to the Solid Waste Management Rules 2016, waste should be segregated at source but not everyone in Delhi practices it, says Mr. Yadav. Of the 11,332 TPD of fresh waste, 6,078.5 TPD is processed at four waste-to-energy plants, 622.4 TPD is processed at composters, biogas plants, organic waste convertors and compost pits, 271 TPD is recycled through 170 Material Recovery Facilities (MRFs). And the remaining 4,360 TPD is disposed of at the dumpsites. Garbage Mountains – Dotting The Landscape Of Delhi Where does the daily waste generated in Delhi go? Ghazipur dumpsite is one of the three dumpsites in the national capital Delhi. The other two are Okhla and Bhalswa dumpsites. Dumpsites: Health And Environmental Hazard On April 8, 2016, the Ministry Of Environment, Forest and Climate Change notified the Solid Waste Management Rules 2016 to lay a solid framework for scientific waste management of waste across urban settlements. The rules apply to all sorts of waste generators: households, event organisers, street vendors, Resident Welfare Associations and Market Associations, gated communities having an area of more than 5,000 square metres, and hotels and restaurants. Also Read: Solid Waste Management In India: The Challenge Of Growing Mountains Of Garbage – Landfills The Solid Waste Management Rules 2016 define “dump sites” as “a land utilised by the local body for the disposal of solid waste without following the principles of sanitary land filling.” Now, what is sanitary landfilling? The rules describe it as, The final and safe disposal of residual solid waste and inert wastes on land in a facility designed with protective measures against pollution of ground water, surface water and fugitive air dust, wind-blown litter, bad odour, fire hazard, animal menace, bird menace, pests or rodents, greenhouse gas emissions, persistent organic pollutants slope instability and erosion. Confused about what this means in layman’s language? “While sanitary landfills are scientific structures or containment systems which are engineered and constructed in a way to isolate waste from the surrounding environment, dumpsites are mere pieces of land without any mechanism for pollution control,” says Dr. Richa Singh, Deputy Programme Manager, MSW (Municipal Solid Waste) team, Centre for Science and Environment. She adds that sanitary landfills have barriers of high-density polyethylene and mechanisms to collect and treat leachate (contaminated liquid generated when water percolates through waste), alongwith the ability to collect landfill gas, which primarily consists of methane and treat that as well. “Living around dump sites comes with health challenges as people in close vicinity are exposed to gases like the colourless and odorless Methane, trace gases like H2S (Hydrogen Sulfide), as well as high levels of Particulate Matter and Ammonia,” says Dr. Singh. These gases are carcinogenic in nature. Long-term exposure to these gases can result in respiratory disorders, and at times it can lead to cancer as well. On dumpsites, while biodegradable or wet waste decomposes over time, the anaerobic decomposition (breakdown of organic waste in the absence of oxygen) of organic waste generates methane gas, which is flammable and generates heat. That’s the reason why dumpsites in Delhi, especially in summer, often catch fire. If not fire, then these are always smoldering in patches, says Dr. Singh. Garbage Mountains – Dotting The Landscape Of Delhi Smoke continues to billow out at Bhalswa dumpsite, days after a fire that broke out on April 26, 2022 As an interim solution (till the remediation of all the legacy waste is done), a gas collection and treatment system for landfill gases is required. Moreover, landfilling of biodegradable and combustible waste should not be done in the first place to prevent the leachate and landfill gas issue. Also Read: Solid Waste Management In India: The Great Garbage Challenge According to the data received from Delhi Fire Services, between 2019 and 2022, the Department received 33 fire calls each from Bhalswa and Okhla dumpsite and 23 from Ghazipur. Garbage Mountains – Dotting The Landscape Of Delhi Incidents of fire at Delhi’s dumpsites between 2019 and 2022 In March 2020, the National Green Tribunal (NGT) formed a committee comprising the Central Pollution Control Board (CPCB), National Environmental Engineering Research Institute, and IIT Delhi to prepare a report on the “Assessment of the amount of damage to environment on account of dumpsites in Delhi”. As per the report prepared by the joint committee in January 2021, the three dumpsites have collectively caused nearly Rs. 450 crore in damage to the environment. The study has assessed the ecological damage caused due to Bhalswa dumpsite at Rs 155.9 crore, Okhla at Rs 151.1 crore and Ghazipur at Rs 142.5 crore. Delhi’s Efforts To Clear Up Legacy Waste Currently, these dumpsites appear to be like hills in the middle of a bustling metropolis. The garbage mountains in Ghazipur and Bhalswa continue to receive fresh waste regularly and a strong stench engulfs the surroundings. Also Read: What Went Wrong With Asia’s Largest Dumpsite – Ghazipur And Delhi’s Waste Management Programme? In an effort to clear up the dumpsite, the waste dumping has stopped at the Okhla site but the other two continue to receive fresh municipal solid waste on a regular basis. Garbage Mountains – Dotting The Landscape Of Delhi The Solid Waste Management (SWM) Rules, 2016 urge local authorities to “investigate and analyse all old open dumpsites and existing operational dumpsites for their potential of biomining and bio-remediation and where ever feasible, take necessary actions to bio-mine or bio-remediate the sites.”

The Human And Health Cost Of Delhi’s Garbage Mountains And Waste Crisis

Delhi relies on a largely informal sector of over 1.5 lakh waste workers to collect, segregate and recycle 20-25% of its waste. As the capital tries to transition to Waste-To-Energy plants, it may be leaving its ragpickers unacknowledged and unrewarded New Delhi: It is quarter to 1 pm in January, the winter sun is shining bright, providing respite from Delhi’s chilly temperatures. Amaruddin is disappointed. Attired in ragged trousers and an old, half-sleeve pink T-shirt that may have seen better days, Amaruddin is walking empty-handed towards his home in the narrow by-lanes of Ghazipur. “I went to the dumpsite but didn’t get any valuable waste to bring home,” he says, justifying his early return. Amaruddin, who hails from West Bengal, came to Ghazipur, an area near the Delhi-Ghaziabad border, with his father in search of a better life. Amaruddin’s father used to collect and sort waste at the Ghazipur dumpsite – the oldest site in Delhi commissioned in 1984 – for a living. Carrying forward his legacy are Amaruddin and his brother Allahuddin. “Waste picking job is demanding. You have to climb the mountain every day and look through the waste. It takes 25 minutes to reach the top,” says Amaruddin. When working at the garbage dump, I slog for two days, followed by a day’s rest to recover from the physical exhaustion. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Two men climbing the tiny waste hill, in Delhi Also Read: Garbage Mountains – Dotting The Landscape Of Delhi In the last 20 years, Amaruddin has tried his hands at multiple jobs – as a waste worker at a dumpsite, a helper at a shop and even at Waste-to-Energy (WTE) plant for three to four years. “At a WTE plant, I used to earn Rs. 12,000 per month, less than what I make from the dumpsite, but I was satisfied because there was a fixed income and a sense of safety and security,” he says. Many years ago, the plant was shut for maintenance and I lost the job. We were assured that we will be hired back in six months, but when the plant reopened, they got new machines and new labour from other parts of the country. Some people even paid to get a job. Currently, Amaruddin is out of work, as the fresh Municipal Solid Waste (MSW) coming to Ghazipur has reduced to around 1,500 Tonnes Per Day (TPD) from 2,000-2,200 TPD until very recently. In addition, trommel machines have been placed at the dumpsite to treat legacy waste that has piled up over the decades, creating a man-made trash mountain of around 40 meters. In 2019, the height of the Ghazipur dumpsite was 65 meters (213 feet) high, only eight meters short of Qutub Minar, a UNESCO heritage site in Delhi. As per the data received from the MCD, 280 lakh tonnes of legacy waste has been dumped on the three dumpsites as of July 2019, with 140 lakh tonnes on the Ghazipur site alone. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Waste workers of Ghazipur sort waste while sitting in between heaps of garbage Amaruddin’s income supports his wife, two young kids, aged 5 and 3, a blind mother and a father who suffers from Tuberculosis. He expects at least one person from the family, who has lived off these waste mountains, to get a job at the WTE. Nove Bibi, 45, another resident of a colony adjoining the dumpsite, feels that waste management “has now become a man’s job”. Around 16 years ago, Nove Bibi along with her young kids arrived by train to Delhi from Kolkata without a ticket. A courageous woman, she made the move to escape the abuse she and her children suffered in the hands of her drug-addict husband. “I don’t like Delhi anymore,” says Nove Bibi. “The dumpsite is shut. The height of the dump yard has increased many folds, making it difficult for us to climb. Men can still find work, but where will I go at this age? People who have land can practice farming. What will I do? I want to work. Give me work,” she pleads. Also Read: Living In The Shadows Of Asia’s Largest Garbage Mountain, The Ghazipur Landfill Nove Bibi’s daughter, Manjura, used to work at a WTE plant for Rs. 15,000 a month. This was before the plant stopped hiring women. “Going to a dumpsite is physically taxing, as it is one tall mountain, and my back and legs hurt,” says Manjura. Whereas, at WTE, you work eight hours a day, six days a week, and get a decent sum of money. The work there is good. Provide me with work at WTE and I will do it happily. NDTV’s team Banega Swasth India tried reaching out to the WTE plant official in Ghazipur to validate the claims made by the informal sector waste workers about losing their jobs at the plant because of maintenance and lay-offs, but didn’t get any response. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Welcome to the Ghazipur dumpsite in the national capital Delhi Dumpsites: Health And Environmental Hazard Experts state that physical weariness is nothing compared to the severe health hazards one is exposed to in and around dumpsites which carry all sorts of waste. The biodegradable or wet waste decomposes over time. The anaerobic decomposition (breakdown of organic waste in the absence of oxygen) of organic waste generates methane gas, which is flammable and gives rise to heat—which explains why many dumpsites in Delhi catch fire during summer months, or are always smoldering with slow flames in some areas. According to the data received from Delhi Fire Services, the Department received 33 fire calls each from Bhalswa and Okhla dumpsite and 23 from Ghazipur between 2019 and 2022. Garbage Mountains – Dotting The Landscape Of Delhi Instances of fire at Delhi’s dumpsites – Ghazipur, Bhalswa, Okhla (2019-2022) “Mixed waste (at dumpsites) catching fire releases dioxins and furans, toxic chemicals which are carcinogenic in nature. There are other harmful gases like Methane and H2S (Hydrogen Sulfide), as well as high levels of Particulate Matter and Ammonia,” says Dr. Richa Singh, Deputy Programme Manager, MSW (Municipal Solid Waste) team, Centre for Science and Environment. Long-term exposure to these gases can result in respiratory disorders, and at times it can lead to cancer as well. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis A fire broke out at Bhalswa dumpsite on April 26, 2022 NDTV team tried visiting the Ghazipur dumpsite but was stopped at the entrance by the representatives of the MCD because of the “dangerous gases” and the “risk of the mountain of garbage collapsing”. Also Read: Solid Waste Management In India: The Challenge Of Growing Mountains Of Garbage – Landfills A walk around any of the three dumpsites in Delhi is impossible without covering one’s nose. A thriving breeding ground for flies and mosquitoes that can cause various vector borne diseases, the potential health hazard of these dumpsites are quite worrying given the contamination they cause of air, groundwater and the overall surroundings. But people like Amaruddin and Nove Bibi are indifferent to it as for them it is a matter of livelihood over health. They say they discover a variety of products in the garbage: sanitary waste, bio-medical waste such as COVID masks and gloves, e-waste such as used batteries, and many other hazardous items. “When waste pickers collect garbage with their bare hands, they often get injured as sharps are lying around. They inhale toxic fumes daily. These people have headaches, nausea, gastroenteritis, and spinal problems. While we can criticise and say why these people live here if it is hazardous, it is their livelihood,” says Chitra Mukherjee, Consultant, Waste and Sustainable Livelihood. A report titled “Assessment of the amount of damage to environment on account of dumpsites in Delhi” in January 2021 by a joint committee of the Central Pollution Control Board (CPCB), National Environmental Engineering Research Institute and IIT Delhi revealed “high level of Chemical Oxygen Demand (COD) and Fe (Iron) in ground water at all three sites” which may be due to leachate from the dumpsite. “Very high levels of COD, Chloride, Total Dissolved Solids (TDS), Total Soluble Solids (TSS), and turbidity were reported in the surface water body (Bhalswa lake) located within a radius of 0-1 km from the Bhalswa site, which may be due to leachate from the dumpsite,” according to the report. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Delhi’s Bhalswa dumpsite, started in 1995, exceeded its capacity in 2006 Waste-To-Energy Plants: A Solution? A waste-to-energy plant is a technology that uses waste to generate electricity. Currently, Delhi has four operational waste-to-energy plants at Okhla, Ghazipur, Bawana, and Tehkhand. Together, they process 6,078.5 tonnes of fresh waste and 828 tonnes of Refused Derived Fuel (RDF) that comes from the dumpsites. Along with this, two more WTEs are proposed – one at Narela-Bawana and another at Ghazipur. The expansion of existing WTEs at Okhla and Bawana has also been proposed. As per Solid Waste Management Rules, 2016 only non-recyclable waste with a calorific value of 1500 K/cal/kg or more should be utilised in WTE plants. However, as per the information shared by the MCD, all WTEs in Delhi receive mixed waste. “These are expensive plants, requiring constant monitoring. The way electricity is produced is negligible. It doesn’t take care of any of our electricity needs in the city. Also, waste generated in India is low in calorific value, high in moisture content, and is less than 1500 K/cal/kg. We are using a lot of the government’s money on a technology that really doesn’t work in the Indian context”, says Ms Mukherjee. It’s being used because incineration is an easy option. As an alternative, we should consider reusing, recycling and composting. Also Read: Garbage Management Crisis: How Effective Are Waste To Energy Treatment Plants? Instead of becoming a solution, WTE plants have become an added problem, say experts like Ms. Mukherjee. A case in point is the Okhla plant, located 35 meters away from 806 DDA SFS Flats of Pocket A and Pocket B of Sukhdev Vihar, which is in close vicinity of densely populated colonies of Hajji Colony, Gajar Manjil, and Noor Nagar. The pollution caused by Okhla WTE is such that the doctors are now advising residents to relocate, if possible. Polluted particles deposit on the lungs and cause respiratory distress. People with compromised immunity, children, the elderly and pregnant women are at a higher risk of developing infections and diseases. “My patients have reported an increase in instances of dermatitis, itching, hypertension and constant headache,” says Dr. Neeta Mishra, Senior Consultant at Apollo Hospitals and a gynecologist, who runs Divine Clinic in Sukhdev Vihar. Pregnant women tell me that when they move to some other part of Delhi, like if they stay at their relative’s place because of this additional burden of pollution coming from WTE, they feel better. Air pollution can shorten lives by almost 10 years in the Indian capital, Delhi, the world’s most polluted city, according to the Air Quality Life Index 2022, produced by the Energy Policy Institute at the University of Chicago (EPIC). The toxic gases released from WTE add to the pollution burden. With mothers getting less oxygen or clean air to breathe, babies’ IQ can be affected. We are playing with the health of our future generations, says Dr. Mishra. Also Read: Disease, Disability And Death: Impact Of Exposure To Air Pollution Dr. Shailendra Bhadoriya, Consultant Cardiologist at BLK-Max Super Speciality Hospital moved to Sukhdev Vihar in 2011, when the Okhla WTE started its operations. According to him, his four-member family developed asthma ever since they moved here because of work. “We see fumes coming out of the WTE plant. Sometimes they are shadowed by the fog and pollution,” says Dr. Bhadoriya, whose children are aged 5 and 12. We moved here because I used to work at Fortis Escorts Heart Institute in this area. None of us were asthmatic before we shifted to this place. Today, we all are asthmatic. My son got admitted to ICU twice in the last six months. Concerned about health hazards from toxic fumes, the residents of Sukhdev Vihar filed a petition in 2009 seeking to invoke Article 21 of the Constitution of India which ensures the “Right to Life”. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Smoke coming out of Okhla WTE, as captured by a resident of Sukhdev Vihar The petition sought relief as such: “Public Interest Litigation (PIL) under Article 226 of the Constitution of India praying that the construction of the proposed Waste to Energy plant close to Okhla STP (Sewage Treatment Plant) should be stopped”. While court proceedings continued, in January 2011, Okhla WTE, namely Timarpur Okhla Waste Management Company Ltd. started its operations. After four years, in February 2013, the case moved to the National Green Tribunal (NGT) where the plant manager M/s Jindal Infrastructure Ltd. refuted all allegations of the Sukhdev Vihar Residents’ Welfare Association stating, “It is specifically denied that the impact of the plant will endanger the lives of the residents and there would be a constant foul smell that will suffocate the atmosphere. Now, when the plant is in operation, there is no odour of municipal solid waste. The plant is a state-of-the-art facility for the purpose of MSW processing.” But, the varied assessments paint a different picture. Ranjit Devraj, a Resident of Sukhdev Vihar took us through the timeline of the legal proceedings as he has been actively involved in the case. In April 2013, testing by the Delhi Pollution Control Committee (DPCC) showed dioxins and furans being emitted by the plant. In September 2013 again DPCC reported high levels of dioxins and furans. Later, in November 2016, the NGT warned the plant operator that it will order a shutdown after DPCC admits that there are high levels of pollution coming out of the plant, said Mr. Devraj. After multiple proceedings, in January 2017, the NGT granted permission for the plant to operate on the condition that it “would not cause any environmental pollution”. The NGT also levied Environmental Compensation of Rs. 25 lakh “for the pollution resulting from deficient functioning/operation of ‘Waste to Energy Plant’ and its stack emissions being in excess of prescribed parameters up to the period of December 18, 2014.” Dissatisfied with the hearing, in May 2017, the residents challenged the decision in the Supreme Court and currently, the case is pending. They appealed for an urgent hearing earlier this year in January, given the Ministry of Environment, Forest and Climate Change accorded environment clearance for the expansion of the Waste to Energy plant upto 40MW. “The matter is sub judice. The WTE plant used to be polluting. But, as he (Commissioner Gyanesh Bharti) says, we are complying with the CPCB norms. If the residents of Sukhdev Vihar are still agitated, I will check,” said CM Arvind Kejriwal during a press briefing after his visit to the Bhalswa dumpsite on March 16. WTE plants cause severe environmental damage and there is evidence to support that. Despite this, the MCD is looking to establish more WTEs and expand the capacity of the existing ones. “Delhi is a landlocked city with a scarcity of land. A WTE plant set-up on 15 acres of land helps manage 3,000 TPD of waste. There is no better waste processing facility. On the contrary, a bio-CNG plant of capacity 300 TPD requires six to seven acres of land”, says Dinesh Yadav, Chief Engineer at the Department Of Environmental Management at the MCD. In our new contracts, like for WTE in Narela, we have put a disincentive mechanism that the operator will have to pay Rs. 300 per metric of bottom ash. This means, now the WTE plant operator will try to take care of bottom ash at his end instead of sending it to dumpsites. While answering NDTV’s team’s question on WTEs, CM Arvind Kejriwal supported the use of the technology and said the city is generating electricity from waste. “In most waste-to-energy plants, segregation of waste is not necessary anymore,” he said. However, in an exclusive interview with Banega Swasth India, Reena Gupta, Advisor, Government of Delhi opposed WTEs. “We are very clear, we don’t want any more WTEs in Delhi. These are highly polluting and WTEs are not meant for populations like us. But, we want to look at the existing WTEs and see if we can change their technology. Is it possible that they become less polluting than they are right now?” she asks. Delhi’s Waste Management Plan Excludes A Skillful Resource – Waste Workers The transition to technologies like WTE plants is not only impacting the environment but has also come with a big hit to waste workers, a transition that has not been just. The SWM Rules define a “waste picker as a person or groups of persons informally engaged in collection and recovery of reusable and recyclable solid waste from the source of waste generation, the streets, bins, material recovery facilities, processing and waste disposal facilities for sale to recyclers directly or through intermediaries to earn their livelihood.” Also Read: Understanding Solid Waste Management Rules 2016 As per Ms. Mukherjee, Delhi relies on a largely informal sector of over 1,50,000 waste workers to collect, segregate and recycle 20-25% of its waste. Yet they remain unacknowledged and unrewarded. They provide an essential service of door-to-door waste collection and segregation. This helps prevent the creation of more landfills as recyclable dry waste is segregated out of the waste stream and recycled. “Ek time esa tha, insaan ko kisi cheez ki kami nahi hone di is khatte ne (There was a time when the dumpsite used to fulfill all our needs),” says 28-year-old Sheikh Ibrahim, who lives around the Ghazipur dumpsite. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Ghazipur dumpsite, spread across 72 acres of land Mr. Ibrahim, the youngest of three children, has been going to the dumpsite for the past 19 years to make a living. The food waste from the nearby hotels would also come to the Ghazipur dumpsite. From fruits, rice, bread to pulses, sometimes drivers would bring food from nearby hotels for the kids of the ragpickers, he says. Pet ke liye jaana padta hai. Rozi roti kamane ke liye (We have to go to the dump site every day and deal with waste to earn our daily bread). Mr. Ibrahim says that an individual’s daily earnings from the dumpsite vary from person to person, as it depends on how often one visits the garbage dump and how much time one spends collecting and sorting waste. Back in the day, one could earn Rs. 500 to Rs. 1,000 a day but now it has come down to zero. Machines are being used to bring down the height of the dumpsite and clear up the legacy waste which is why fresh waste from East Zone is not discarded here anymore, he adds. Also Read: Solid Waste Management In India: The Challenge Of Growing Mountains Of Garbage – Landfills For a couple of years, Mr. Ibrahim also worked at the WTE plant in Ghazipur set up by IL&FS Environment on a Public Private Partnership framework. I would bring home Rs. 14,000, post deduction of money for the Provident Fund. However, there were irregularities in salary and when we raised our voice against it, we were laid off. The plant was then shut off for six months for maintenance purposes and we were told that they will hire us back but nothing of that sort happened, he says. The Solid Waste Management Rules 2016 and Plastic Waste Management Rules 2016 have mandated the inclusion of informal waste workers in waste management but the on-ground reality is different. The Human And Health Cost Of Delhi's Garbage Mountains And Waste Crisis Marzina Bibi, a waste worker from Delhi cleans and sorts plastic waste for Rs. 300 a day “A legal framework is required to ensure an inclusive and fair transition of waste pickers and other informal workers in the waste value chain, allowing them decent work opportunities in times where increasingly private actors are competing for access to waste,” says Ms. Mukherjee. Team Banega Swasth India asked CM Kejriwal about his government’s plan to provide an alternative source of livelihood for waste workers. He said, I don’t think there is any systematic plan. Let me find out. Experts believe that a just transition can take place if we consider protecting the incomes and livelihoods of waste workers by including them in the country’s waste management planning. “The municipality needs to register waste pickers to set up authorised 100% doorstep collection of waste and ensure only non-recyclable waste goes to landfills,” adds Ms. Mukherjee. Dr. Singh suggests taking lessons from cities like Indore, Pune and Ambikapur that have got waste management in place right from source segregation. Pune Municipal Corporation (PMC) signed an MoU with SWaCH (Solid Waste Collection and Handling), a cooperative wholly owned by waste pickers/collectors, to decentralise the door-to-door collection of waste. The cooperative members collect segregated waste from over 2,000 households. The non-recyclable waste is further segregated for sale, while the wet/organic and non-recyclable waste is dropped off at PMC ‘feeder points,’ from where it is collected by the municipal garbage trucks and sent to the landfill. “The plan is to involve them (waste workers). Without them, there is no way waste management can actually work. Whenever we redesign the waste collection/management contracts, we will make sure that the informal waste speakers are taken care of,” says Ms. Gupta. As Delhi struggles to manage its waste and seeks solutions, it has lessons to learn from cities like Indore, Pune and Ambikapur, where municipal corporations work effectively with waste collectors.

Reinvent economic growth model

Climate change is an existential threat, we know that. But what we continue to deny is the need for drastic emission reduction, that too in a world where millions still need the right to development. In India, the poor, already surviving on the margins, are severely impacted by extreme weather events. They are the first victims of climate change — and remember, always, that they have not contributed to the stock of greenhouse gases in the atmosphere. So, as we move ahead, we must recognise the imperative of climate justice. The reasons are inconvenient but simple. Carbon dioxide (CO2) has a long residence time in the atmosphere and so, what is emitted in the past has accumulated and will "force" temperatures to rise. Then, CO2 is linked to the way the world runs the economy — fossil fuels (coal or gas) are still determinants of growth. Most importantly, millions of people are still waiting to get the benefits of economic progress — which means access to affordable energy. And, this at a time when the world has literally run out of carbon space to accommodate their need for development. So, what will this part of the emerging world do? Their growth — use of fossil fuels — will add to the jeopardy that awaits us. How can this "growth" be reinvented so that it is low-carbon, sustainable and yet affordable? It is not enough to berate and bully the emerging world countries into action. For far too long, the world has worked overtime to erase or dilute climate equity in the negotiations. The much-lauded 2015 Paris Agreement got rid of the very concept of historical emissions; it consigned climate justice to a postscript. t even removed the idea of "compensation" for the loss and damage suffered because of climate change. Worse, it created a weak and meaningless framework of climate action that would depend on what a country could do; not what it was expected to do based on its contribution to the stock of emissions or fair share. It should not surprise us then that the sum of the nationally determined contributions (NDC) — UN jargon for national reduction targets — takes the world towards a minimum of 3°C temperature rise or more. The world should no longer dilly-dally around with empty promises of net-zero targets for 2050. It must discuss how countries will front-load emission reductions for 2030. The "old" industrialised countries and new entrant China have appropriated 73 per cent of the carbon space till 2019, and, even with the reduction targets announced, will occupy 70 per cent by 2030. This is why future actions must accept the reality of climate equity and use it to drive economic growth. If we do this, then the opportunity of real change opens up — if we invest today in the poorest economies they can grow without pollution. For instance, the energy needs of the poorest in the world. Millions of women still use biomass to cook, which adds to their health burden as these stoves are extremely polluting. The way ahead would be to use clean renewables to meet the needs of these households, which are still outside the fossil fuel energy system. But the cost of renewable energy is beyond their affordability. So the world must not preach the need for energy transitions but pay for these to happen — today. This is where the discussions on markets — Article 6 of the Paris Agreement — should be put to work. The current effort is to find smart and cheap ways to build a market instrument that will reduce the cost of carbon purchase from the developing world. A repeat of the complicated, convoluted and cheap Clean Development Mechanism (CDM) must not be allowed. Instead, market instruments should be used for transformational action so that projects that will bring "big bang" carbon reductions can be paid for through this instrument. For instance, the provision of clean energy through millions of mini-grids in the world of the poorest. In this way, the market will be by public policy and intent, and not left to discover new scams in the name of carbon offsets. This is also where discussions on nature-based solutions must be firmly rooted. We must not miss the wood for the trees — literally in this case. There is an opportunity to use the ecological wealth of poor countries and communities for mitigation as trees and natural ecosystems sequester CO2. So, trees should not be viewed as carbon sticks but as opportunities for livelihoods and economic well-being of the poor. The rules for carbon offsets for forests must be developed with this in mind — deliberately and with statecraft. The fact is, we have lost precious time in finding "smart" ways to do as little as possible to reduce greenhouse gas emissions and it is time this stopped. We need to drive policies knowing that we live in an interdependent world, where cooperation is critical, and that ensuring this requires fairness and justice. Climate change is our biggest challenge yet as a human race and it is time we stood up to it.(Writer is Director General of CSE and editor of Down To Earth, an environmentalist who pushes for changes in policies, practices and mindsets)

CAQM sets timelines for captive thermal power plants to phase out coal

The Commission for Air Quality Management (CAQM) in National Capital Region and Adjoining Areas has set timelines for captive thermal power plants (CTPPs) to phase out coal and replace it with co-firing biomass and straw pellets. Captive power plants provide localised sources of power typically to industrial facilities. In an order issued on Monday, CAQM directed CTPPs to initiate immediate steps to co-fire biomass-based pellets with coal through a continuous and uninterrupted supply chain targeting at least 5% co-firing of biomass pellets by September 30 and at least 10% co-firing by December 31 for effective utilisation of agricultural residue. The move is aimed at reducing their coal dependence. The CAQM clarified the order applied to CTPPs for which no restrictions existed until now. There is a separate timeline for NCR’s 11 coal-based thermal power plants. CAQM issued a comprehensive policy on air pollution in NCR in July last year under which the 11 plants were directed to meet their co-firing targets of 5% by September 30, 2022. They were to be co-firing 10% by the March end of this year. A Centre for Science and Environment (CSE) analysis on March 16 showed a majority of these power plants were unlikely to meet the deadline. “Until December 2022, the power plants under the ownership of [the] Haryana state government— the Rajiv Gandhi TPP, Yamuna Nagar TPP, and Panipat TPP – have invited both short-term and long-term tenders, but none of these tenders have been awarded. The Mahatma Gandhi TPP, Dadri TPP, and Indira Gandhi TPP are the only coal-based power plants in Delhi-NCR that have successfully placed long-term orders by December 2022,” the analysis said. It added the Panipat TPP, Mahatma Gandhi TPP, Nabha TPP, Ropar TPP, and Guru Hargobind TPP issued tenders for biomass pellet procurement, but they were of much less quantity than what was needed to meet the 5% threshold. Centre for Research on Energy and Clean Air analyst Sunil Dahiya said the move sought to incentivise farmers and to ensure agricultural residue is not burnt. He added most power plants seemed to have missed the harvesting window for procurement. “On paper, we are reducing coal usage and utilising this agricultural residue which will cause less pollution overall...if the window to procure has been missed, then it will be very difficult to get these bio-pellets or residue now. We need to ensure that these thermal power plants procure residue when harvesting begins.”

CAQM sets timelines for captive thermal power plants to phase out coal

The Commission for Air Quality Management (CAQM) in National Capital Region and Adjoining Areas has set timelines for captive thermal power plants (CTPPs) to phase out coal and replace it with co-firing biomass and straw pellets. Captive power plants provide localised sources of power typically to industrial facilities. In an order issued on Monday, CAQM directed CTPPs to initiate immediate steps to co-fire biomass-based pellets with coal through a continuous and uninterrupted supply chain targeting at least 5% co-firing of biomass pellets by September 30 and at least 10% co-firing by December 31 for effective utilisation of agricultural residue. The move is aimed at reducing their coal dependence. The CAQM clarified the order applied to CTPPs for which no restrictions existed until now. There is a separate timeline for NCR’s 11 coal-based thermal power plants. CAQM issued a comprehensive policy on air pollution in NCR in July last year under which the 11 plants were directed to meet their co-firing targets of 5% by September 30, 2022. They were to be co-firing 10% by the March end of this year. A Centre for Science and Environment (CSE) analysis on March 16 showed a majority of these power plants were unlikely to meet the deadline. Find The Perfect Shade From Over 2,000 Pre-Selected Colours Find The Perfect Shade From Over 2,000 Pre-Selected Colours Ad Valspar “Until December 2022, the power plants under the ownership of [the] Haryana state government— the Rajiv Gandhi TPP, Yamuna Nagar TPP, and Panipat TPP – have invited both short-term and long-term tenders, but none of these tenders have been awarded. The Mahatma Gandhi TPP, Dadri TPP, and Indira Gandhi TPP are the only coal-based power plants in Delhi-NCR that have successfully placed long-term orders by December 2022,” the analysis said. It added the Panipat TPP, Mahatma Gandhi TPP, Nabha TPP, Ropar TPP, and Guru Hargobind TPP issued tenders for biomass pellet procurement, but they were of much less quantity than what was needed to meet the 5% threshold. Centre for Research on Energy and Clean Air analyst Sunil Dahiya said the move sought to incentivise farmers and to ensure agricultural residue is not burnt. He added most power plants seemed to have missed the harvesting window for procurement. “On paper, we are reducing coal usage and utilising this agricultural residue which will cause less pollution overall...if the window to procure has been missed, then it will be very difficult to get these bio-pellets or residue now. We need to ensure that these thermal power plants procure residue when harvesting begins.”

Power purchase in Delhi shows rising trend once again

The total power purchase in Delhi, which showed a downward trend during Covid-19, increased to 37,460MU in 2021-22, according to Economic Survey of Delhi 2022-23. Discom officials said 2022, which was mostly free of Covid restrictions after two consecutive years, saw Delhi breaking several past records of power consumption. Delhiites consumed almost half the power during the two Covid waves in 2021 than in 2022. In 2019, the peak summer demand was 7,409 MW, which was also more than that of 2020 and 2021, said discom sources. November and December 2022 saw the peak winter power demand at more than that of the previous two years. “While 16.65% of the total power purchase is sourced from own generation by Delhi government’s power plants, 83.34% is purchased from the central government and other sources,” it added. The survey, however, revealed that the city had managed to harvest only 20MW of additional solar power this financial year. According to it, the total power generated by solar systems was 244MW till September 2022 against 223.6MW in 2021-22. “To promote use of green power through solar in Delhi, Government of NCT approved Delhi Solar Policy 2016 with the aim to install 2,000MW solar installation by 2025… Solar systems’ installed capacity is 244MW at 6,864 locations,” the survey stated. Delhi government has also reiterated its aim to generate 2,000MW of solar power by 2025, prompting experts to call for prompt action. The data shows that over a decade, the entire power purchase has increased from 33,390MU in 2011-12 to 37,460MU in 2021-22, and the number of consumers from 43.01 lakh to 65.9 lakh. The power department has subsidised 100% of the energy charges for domestic consumers consuming up to 200 units per month and given a subsidy of up to Rs 800 per month for those consuming between 201-400 units. As per Outcome Budget, 48.9 lakh domestic consumers are entitled to the subsidies and 75% of them availed of it. Waste-to-energy plants are being set-up at various locations in Delhi, including a Municipal Corporation of Delhi-National Thermal Power Corporation joint venture for a 12MW plant, said the report. In 2016, the government issued a policy making solar power installations mandatory on all government buildings having a rooftop size of 500 sqm or above and offered a generation-based incentive for three years in residential areas. But experts pointed out that the existing solar capacity was just a fraction of the 2025 target. “The ministry of new and renewable energy has set a target for Delhi at 2.762GW (2,762MW) by the end of 2022, but the existing solar power capacity is roughly 0.2GW,” said Aditya Lolla, a senior policy analyst at energy thinktank Ember. “If we go purely by numbers, Delhi will have to add 60MW of solar power every month to achieve 2,000MW by 2025 or the next 30 months,” Lolla added. Experts also pointed out that the government would need to find alternatives and encourage public. “At this pace, we will reach nowhere. The authorities must address several issues, including realising the potential. Rooftops at apartments are full of water tanks and AC units. We will have to find alternatives. There was a draft policy on rooftop, which seemed encouraging, but we are not aware of its status,” said Binit Das, deputy programme manager, renewables at Centre for Science and Environment. He pointed out that the virtual net metering might also not be of much use in Delhi due to the provision of free power units. “We have observed that the rooftop solution is working really well in the states with high tariff.”

Power plants in Delhi fails to adhere to biomass co-firing policy

According to a recent report published on March 16, several coal-based power plants in Delhi-NCR have made very little progress in following instructions to use biomass or agricultural leftovers for electricity generation. According to the Centre for Science and Environment (CSE), which carried out the study, a recent announcement (February 2023) by the Environment Ministry has allowed these plants additional latitude to postpone complying with the directives... The Union Ministry of Electricity had ordered the facilities to use biomass or agricultural waste to replace five to ten percent of the coal they use to generate energy by October 2021... Nivit Kumar Yadav, Programme Director, Industrial Pollution, CSE, said, “Our study shows that cumulatively, less than one per cent of the coal consumed per year in these 11 plants had been replaced with agro-residues until December 2022.”..

India: How electric vehicles are driving a green transition

With a surging car market, India's transition to electric mobility will be faster as automobile companies make big-ticket investments in the development of infrastructure to facilitate electric vehicle penetration in the country, industry experts expect. "I am bullish about the EV market. Given the right impetus, rising EV adoption will create an immediate requirement to embrace the next-generation needs of the automotive industry," Jaideep Wadhwa, director of Sterling Gtake E-Mobility, a motor control units' manufacturer for EVs, told DW. India is the third-largest automobile market globally in terms of sales, even ahead of major markets like Germany and Japan. Given the encouraging signs, there is now a push for manufacturers and policymakers to work together to shift demand towards greener options. The Economic Survey 2023, an annual document of the Finance Ministry, predicts that India's domestic electric vehicle market will see a 49% compound annual growth rate between 2022 and 2030, with 10 million annual sales by 2030. Investment opportunities Another independent study by the Center for Energy Finance (CEEW-CEF) showed that the EV market in India will be a $206 billion (€194 billion) opportunity by the end of this decade if it maintains steady progress to meet its ambitious 2030 target. This would require a cumulative investment of over $180 billion in vehicle production and charging infrastructure. In 2021, the Indian EV industry attracted $6 billion in investment and is becoming steadily more attractive to private equity and venture capital investors. "This is a positive sign that the market is picking up, especially in the two and three-wheeler segments where the cost of ownership and cost parity with the internal combustion engines have improved considerably," Anumita Roy Chowdhury, executive director at Center for Science and Environment, told DW. Chowdhury pointed out that the ongoing federal government incentive program and state-level policies have contributed to this trend and have also helped to build the electric bus program for zero emissions urban commuting. Meeting India's climate targets At the COP26 summit in Glasgow, India pledged to achieve net-zero emissions status by 2070 and to lower its emission intensity by 45% from 2005 levels by 2030. EVs could help realize these goals and play a pivotal role in India's green transition. In Glasgow, India rolled out its website e-AMRIT, which functions as a one-stop destination for all information on EVs and addresses concerns about the adoption of EVs and their purchase — such as charging facility locations and EV financing options as well as information about investment opportunities, government policies, and available subsidies for drivers and manufacturers. Currently, the transport sector accounts for 18% of total energy consumption in India, which translates to an estimated 94 million tons of oil-equivalent (MTOE) energy. The Bureau of Energy Efficiency estimates that, if India were to follow the current trends of energy consumption, it would require an estimated 200 MTOE of energy supply annually by 2030 to meet demand. "With supportive government policies, increasing consumer awareness, and improvements in technology, we will transition towards a more sustainable and eco-friendly mode of transportation," a senior government official told DW, requesting anonymity. Indian conglomerates such as Reliance, Adani, and Tata are similarly investing in electric vehicles and green hydrogen. They are beginning to invest huge money consequently in clean technology sectors such as electric vehicle charging infrastructure, biofuels, renewables, carbon capture and storage, and green hydrogen. But the road to a fully-electric ecosystem still has a distance to traverse with high costs, inadequate infrastructure, and lack of high performing EVs, cited as reasons. Hoping to convert more consumers into EV owners, the government is offering subsidies for its purchase, and a tax exemption of 150,000 Indian Rupees (€1,708, $1,818) is also given for people buying electric cars on loan. The future of transportation During the stage of "faster adoption and manufacturing of hybrid and electric vehicles" (FAME), the government has been trying to improve the infrastructure for electric vehicle manufacturing in the country. There are more than 65,000 gas stations in the country but only 1,640 EV charging stations. Petroleum companies are expected to come up with a plan for 22,000 EV charging stations by 2024. In comparison, China has approximately 900,000. Moreover, a battery swapping policy has been put forward as an easier way to charge EVs. Last year, the government also announced a production-linked incentive scheme for automakers, a part of which aims to boost electric vehicle manufacturing. "A lot of things are possible. Every street lamp can also be turned into a charging station with the swipe of a credit card. But what is good to know is that many states have introduced policies that have led to the increased adoption of EVs," Wadhwa said. However, the change in the electric car segment compared to two- and three-wheelers, is slower, as costs are still high. According to NITI Aayog, an Indian public policy think tank, by 2030, 80% of two- and three-wheelers, 40% of buses and 30%-70% of cars in India will be EVs. While it is encouraging to see the market picking up, Chowdhury stressed a lot more is needed to meet NITI Aayog's recommended aspirational target. "This will require immediate intervention to define the next stage of the current incentive program, which is coming to an end in 2024, and a regulatory target with zero emissions vehicle mandate to accelerate the electric mobility transition," Chowdhury said.

Q&A: How the EU wants to race to net-zero with ‘Green Deal Industrial Plan’

At least 40% of the EU’s low-carbon technologies – from solar panels to heat pumps – will need to be made within its borders by 2030 under new plans. The European Commission has set out a series of proposed targets and reforms that collectively make up its Green Deal Industrial Plan. It is an explicit response to China’s dominance in the sector and the wave of low-carbon subsidies announced in the US Inflation Reduction Act last year. In order to take on these rivals, the commission says EU member states need to cut “red tape”, end “excessive” bureaucracy and fast-track net-zero projects. It also calls for the bloc to ramp up production of “critical raw materials” for the low-carbon economy. To help fund these activities, the commission has loosened rules around the money that governments can hand out to low-carbon companies – potentially paving the way for a subsidy race with other nations. However, concerns remain over how member states and businesses will finance such a major industrial transition. A reform of the EU’s electricity market design has also been released, which the commission says will help Europeans benefit from the expansion of cheap renewable power. The commission has framed all of these proposals as a key part of its ambition to achieve net-zero emissions by 2050. In this Q&A, Carbon Brief examines all of the proposals that together make up the EU’s Green Deal Industrial Plan. All of the proposals must now be discussed and agreed by the European Parliament and the EU Council before they can enter into force. Why has the EU produced a Green Deal Industrial Plan? What are the targets for low-carbon technologies in the EU? How would the EU cut ‘red tape’ for low-carbon projects? How does the EU plan to source ‘critical raw materials’? How is the EU proposing to reform electricity markets? How will EU green industry be financed and subsidised? How would the plan create ‘high-skilled jobs’? How does the plan aim to ensure ‘fair trade’ for ‘green’ businesses? Why has the EU produced a Green Deal Industrial Plan? Back in August 2022, US president Joe Biden made history by passing the largest package of domestic climate measures ever under the Inflation Reduction Act (IRA). The IRA contains $369bn for climate measures such as tax breaks for low-carbon energy and electric vehicles. The bill initially attracted widespread praise, with many describing it as a landmark moment for climate action in the world’s second-highest emitting country. However, by the autumn of 2022, tensions started to brew about how the IRA may affect industry and business in other countries – and even fuel a global “clean-energy arms race”. Countries started to argue that the small print of the IRA – which stipulates that generous subsidies will only be on offer to companies operating mostly or wholly in the US – amounted to “green protectionism” and could harm business overseas. There are two passages in the IRA that have particularly caused a stir. The first is the stipulation that tax credits for low-carbon energy technologies, such as batteries, solar panels and wind turbines, should only apply to products made within the US. (This is shown in the extract of the IRA below.) The second is a section of the act that offers US consumers tax credits to buy electric vehicles only if they’ve been assembled in North America. This passage also says that critical minerals and batteries needed for EVs must increasingly be bought from North America or a country with which the US has a preferential trade agreement. At the forefront of criticism of these terms was the EU. On a trip to the US in December, French president Emmanuel Macron warned that the “protectionist” terms of the IRA risked “fragmenting the west”, according to the Financial Times. Around the same time, European Commision president Ursula von der Leyen told an event that the IRA was “raising concerns” amid “a very particular backdrop for our industry and economy”, EurActiv reported. As well as facing fears that the tax breaks laid out in the IRA could lure business away from Europe, the EU also has concerns about China’s tight grasp on the production of many minerals and technologies key for low-carbon energy. China is currently the leading global supplier of low-carbon energy technologies. It holds at least 60% of the world’s manufacturing capacity for technologies such as solar, wind and batteries and accounts for 40% of electrolyser manufacturing, according to the International Energy Agency. It also has a near-monopoly on the production of many minerals critical for low-carbon technologies (more on this below). On 17 January during the World Economic Forum meeting in Davos, von der Leyen told delegates that the EU would counter the IRA with its own Green Deal Industrial Plan, Reuters reported. She told reporters that she first had the idea for such a plan in September 2022, but did not yet have the support of all EU governments. (It comes after the EU published its REPowerEU strategy in May 2022, which aimed to end the bloc’s reliance on Russian fossil fuels following the invasion of Ukraine. While this strategy focused on reducing fossil fuel use, the new Green Deal Industrial Plan focuses more on boosting low-carbon manufacturing and industry within Europe.) On 1 February, the commission announced the first details of its Green Deal Industrial Plan. Von der Leyen said in a statement the plan would aim “to secure the EU’s industrial lead in the fast-growing net-zero technology sector”. According to the commission, the plan can be split into four pillars. The first pillar of the plan is to create a “simpler regulatory framework”. To achieve this, the commission is proposing a new Net-Zero Industry Act to “identify goals for net-zero industrial capacity and provide a regulatory framework suited for its quick deployment”. (The Net-Zero Industry Act, which was published on 16 March, is discussed in more detail below.) The commission added that the Net-Zero Industry Act will be complemented by a Critical Raw Materials Act to “ensure sufficient access to those materials”. (This act was also published on 16 March and is discussed in more detail below.) The second pillar of the plan is to “speed up investment for clean-tech production in Europe”. To achieve this, the commision wants to amend its framework for state subsidies to increase support for low-carbon technologies. The commission also promised to facilitate the use of existing EU funds for low-carbon projects, it says. The third pillar of the plan is to ensure the transition to net-zero creates new high-skilled jobs, according to the commission (more on this below). And the final pillar of the plan is to ensure that any green trade is carried out “under the principles of fair competition and open trade”. (It comes after the EU accused the US of flouting World Trade Organization rules with the IRA, more detail below.) All of the new legislation proposed by the commission will need to be approved by member state governments in the European Council and by public representatives in the European Parliament, before it can be implemented. Back to top What are the targets for low-carbon technologies in the EU? The proposed Net-Zero Industry Act repeats the EU’s commitment to reaching net-zero emissions by 2050 and, as a stepping stone, slashing emissions by 55% on 1990 levels by 2030. Under a section titled “reasons for” the proposal, the commission cites recent plans to boost low-carbon industries in other countries, including the IRA and China’s green policies, as well as Japan’s Green Transformation programme and India’s Production Linked Incentive scheme. (A leaked draft of the act said these schemes risked “dragging away” investments from the EU). The proposed act sets a “headline benchmark” of ensuring that at least 40% of low-carbon technology needs are met by manufacturing within the EU by 2030. Specifically, this target applies to a list of eight “strategic net-zero technologies”, which excludes nuclear power. The eight technologies are: Solar power and solar thermal Onshore and offshore wind power Batteries and energy storage Heat pumps and geothermal energy Electrolysers and fuel cells Sustainable biogas/biomethane Carbon capture and storage (CCS) Grid technologies The proposal says the 40% benchmark represents “an overall political ambition of achieving high resilience across strategic net-zero technologies and the overall energy system, while taking into account the need to pursue that ambition in a flexible and diversified way”. It notes that for some technologies, such as solar PV modules, the 40% figure “represents a realistic, but ambitious scale-up effort of the corresponding manufacturing capacity”. (Europe currently imports nearly all of its solar PV modules – mostly from China, according to the International Energy Agency.) An earlier leaked version of the act had listed specific manufacturing targets for different low-carbon technologies by 2030, but they did not make it into the final draft. These included: Ensuring 40% of solar annual deployment needs are met by manufacturing in the EU. Ensuring 85% of wind annual deployment needs are met by manufacturing in the EU. Ensuring 60% of heat pump annual deployment needs are met by manufacturing in the EU. Ensuring 85% of battery annual demand is met by manufacturing in the EU. Ensuring 50% of the renewable and green hydrogen annual deployment needs are met by electrolyser manufacturing in the EU. These initial targets “raised a lot of eyebrows”, says Domien Vangenechten, a senior policy adviser at climate thinktank E3G. He tells Carbon Brief: “They were very technology specific. I think the EU is taking the safe route here by saying we’re not going to be very prescriptive by setting manufacturing targets for individual sectors, but more healthy aspirational targets.” He added that it is likely that the 40% benchmark figure will be further digested and scrutinised in the coming months. Achieving the benchmark would require shifts to global low-carbon energy supply chains. China is currently the leading global supplier of low-carbon energy technologies. It holds at least 60% of the world’s manufacturing capacity for technologies such as solar, wind and batteries and accounts for 40% of electrolyser manufacturing, according to the International Energy Agency. The chart below, also from the IEA, shows China’s dominance (red) in manufacturing capacity for low-carbon technologies such as solar, wind and batteries in 2021. Another target, which is quite distinct from the rest of the strategy, is an EU-wide objective to develop 50m tonnes of CO2 storage by 2030. There is currently no “injection capacity” in the EU, but countries such as Denmark and Netherland are already working on plans. The commission plans to mandate existing oil-and-gas producers to make depleted gas fields and other capacity available to store CO2. Simone Tagliapietra, from the thinktank Bruegel, tells Carbon Brief that, in his view, this is “the most viable element” of the whole Net-Zero Industry Act, as it would see an EU-wide target broken down into individual targets for fossil fuel companies. Back to top How would the EU cut ‘red tape’ for low-carbon projects? The Net Zero Industry Act’s primary aim is to create a “predictable and simplified regulatory environment” for net-zero projects. In her statement introducing the the Green Deal Industrial Plan, Von der Leyen said: “It will speed up permitting – this is one of the major complaints. When you speak to the net-zero industry, the major complaint is always the permitting processes…A big focus is on cutting red tape.” This point is reiterated in the act, which says: “The unpredictability, complexity and at times, excessive length of national permit-granting processes undermines the investment security needed for the effective development of net-zero technologies manufacturing projects.” The issue of long permitting delays for building new EU wind and solar projects was addressed in the REPowerEU plan last year. The European Parliament subsequently agreed on a tightened nine-month permitting time for installations in designated “renewable acceleration areas”, though this still needs to be approved by member states. Rather than installation, this week’s new act focuses on factories for manufacturing these low-carbon technologies and their components. As it stands, such facilities take between two and seven years to undergo permitting, the commission says, depending on the country and technology. The commission proposes to dramatically shorten this time, but how much depends on whether or not technologies are deemed “strategic”. Eight “strategic net-zero technologies” – the ones covered by the 40% manufacturing target – are given “priority status”. They have been selected on the basis of being “commercially available”, with “a good potential for rapid scale-up”. The commission says new factories for strategic net-zero technologies should be given a permit within 12 months, if they have annual manufacturing capacity of more than 1 gigawatt (GW). This falls to nine months if their output is below 1GW. If member state authorities fail to comply with these time limits, projects would be automatically approved, unless they require a specific environmental impact assessment. Factories making other net-zero technologies are also covered by the act, but they have longer permitting time limits of 18 months and 12 months, for sites with output above and below 1GW, respectively. (For projects that are not measured on a GW basis, the upper time limits would apply.) Technologies that are not included on the priority list include sustainable aviation fuels and, significantly, nuclear power. The latter was initially pegged to appear as the ninth “strategic” technology on the priority list. However, there were reports of disputes between commissioners over whether it should stay. In the end, the act only covers factories making machinery and components for “advanced” nuclear technologies and “small modular reactors”, rather than for nuclear power plants in general. Under the commission’s proposals, member states would set up a national authority as a “one stop shop” for permitting net-zero manufacturing projects. While it says EU environmental assessments are “an integral part” of permit granting, it also states: “Based on its case-by-case assessment, a responsible permitting authority may conclude that the public interest served by the project overrides the public interests related to nature and environmental protection and that consequently the project may be authorised.” Some environmental NGOs have expressed concern about deregulation and looser permitting processes that might clash with environmental protections. European Commission climate lead Frans Timmermans acknowledged these concerns in a press briefing launching the act, explaining: “It sounds like squaring the circle when you first start thinking about this, but what we think we can do is speed up processes without undermining our nature legislation, and I think this can be done through streamlining the processes [and] working very closely with authorities at all levels to also employ industry from the get-go.” Timmermans also seemed optimistic about public support for the strategy. He cited the broad support for moving away from Russian fossil fuels following the invasion of Ukraine, adding that “the whole issue of NIMBY [not in my back yard] has become completely different”. Back to top How does the EU plan to source ‘critical raw materials’? “Critical raw materials” are defined by the EU as metals and minerals that are economically important, but have high risks associated with their supply. Many are vital for the net-zero transition, including the lithium used in batteries and the copper for wind turbines. The International Energy Agency (IEA) anticipates that global demand for these kinds of materials will roughly quadruple over the next two decades. EU officials have often made the comparison with the bloc’s current dependence on fossil fuel imports from foreign powers. Von der Leyen said in her 2022 state of the union address that “we must avoid becoming dependent again, as we did with oil and gas”. The EU is 100% dependent on imports for half of the 30 minerals it defined as “critical”, as of 2020, according to research institute DIW Berlin. The institute also notes that many of the countries the bloc is dependent on are “less democratic”. Europe does not have a large share of many critical mineral reserves, nor does it account for much mining. This can be seen in the IEA chart below, with the continent’s shares for key resources indicated by dark blue bars. China is seen as the main focus of this part of the EU’s plan. China has a near-monopoly on many critical mineral exports, which has already led to supply chain issues in Europe. This is generally not because of China’s large reserves – as seen in the figure above – although it does mine more rare-earth elements than any other country. Instead, as the IEA chart below shows, China (red) tends to dominate in the processing and refining of minerals. The Critical Raw Materials Act, another component of the EU’s strategy, includes goals of increasing the bloc’s domestic capacity, diversifying its trading partners, monitoring for future risks and increasing the “circularity and sustainability” of critical raw material use. It states: “The risk of supply disruptions is increasing against the background of rising geopolitical tensions and resource competition.” Industries such as lithium and rare-earth metal mining are essentially non-existent in the EU, although it does have some reserves. The commission proposes scaling up rapidly by giving special treatment to “strategic projects” involved with mining, processing or recycling. These projects would be identified by the commission, working with a European Critical Raw Materials Board – a new central purchasing agency to coordinate action across the EU. The act adds that the recently revised state aid rules may allow countries to channel more public funds into critical minerals extraction. (See: How will low-carbon technologies be financed under the Green Deal Industrial Plan?) As it stands, permitting for mines in the EU can take a decade or more. The act emphasises the need to speed up the early stages of strategic projects, noting that assessment processes “should remain light and not overly burdensome”. Campaigners have expressed concerns that this would mean environmental safeguards are overlooked and communities are ignored. The development of new mines in some parts of the bloc is already facing a backlash, for example from Portuguese villagers and Indigenous groups in Sweden. The act acknowledges these issues, emphasising the importance of “ensuring environmental protection, socially responsible practices and transparent business practices”. It adds: “As public acceptance of mining projects is crucial for their effective implementation, the promoter should also provide a plan containing measures to facilitate public acceptance.” One way to reduce the need for new mines is to lean more into recycling. Prof Lukas Menkhoff, head of the global economy department at the thinktank DIW Berlin, tells Carbon Brief he is “glad to see a quota for recycling” in the act, but adds: “In the short-run, however, 15% may be ambitious, if we think, for example, about batteries from cars which may not be often replaced until 2030.” The EU does not have sufficient reserves of every critical raw material within its borders. The act, therefore, acknowledges the need to rely on other nations for imports, but emphasises diversifying the bloc’s supply chains. The commission lays out the need for partnerships with trusted, resource-rich countries where it can support “strategic projects” that will guarantee the EU a supply while remaining “mutually beneficial”. It mentions Chile and Australia as having potential for “win-win partnerships”. These projects could be supported by the EU’s Global Gateway, a €300bn pot for financing EU interests abroad. The commission emphasises that “high environmental and social conditions continue to apply” for these foreign initiatives. The act sets a target of not being dependent on one single nation outside of the EU for more than 65% of any one critical raw material by 2030. This proposal has reportedly already made waves in China’s renewables industry. Diego Marin, a policy officer for raw materials at the European Environmental Bureau (EEB) tells Carbon Brief that Chile, for example, already provides more than 65% of the EU’s lithium, but says this is unlikely to be wound back: “Chile and the EU have a pretty good relationship. I think this is more of a dig at China.” The Green Deal Industrial Plan also mentions “explor[ing] the creation of a Critical Raw Materials Club” to bring together consumer and producer countries. (On 13 March, the Financial Times reported that the US and EU have launched new talks on critical minerals.) Back to top How is the EU proposing to reform electricity markets? After Russia’s invasion of Ukraine caused energy prices to spike last year, the European Commission pledged to reform the EU’s electricity market rules. In doing so, the commission hoped to make energy bills less susceptible to swings in fossil fuel prices, of the kind seen when Russian gas supplies were curtailed. It also wanted to allow consumers to experience the benefits of lost-cost renewable power. Under the existing system, electricity prices are set in the same way as for all other commodities, via “marginal pricing”. In practice, this means electricity prices are set by the most expensive power plant needed to meet demand at each moment – usually gas – rather than by increasingly cheap renewables. In response to the high cost of electricity driven by record-high gas prices, the commission expressed a desire to “decouple” electricity from gas prices. However, EU member states have disagreed about how ambitious these market reforms should be. Nations including France and Spain have favoured extensive changes, while Germany among others has warned against such deep reforms. The commission has now published its proposals for reform as part of the bundle of Green Deal Industrial Plan documents. In the end, it has opted for a system that would support the deployment of renewables, but would not fundamentally change the way the electricity market is structured. It argues that this will, ultimately, yield the same result of reducing reliance on fossil fuels and cutting bills. “The commission plans to tackle high prices from gas power generation in the best way – by reducing its significance,” said Vilislava Ivanova, clean energy systems research manager at E3G, in a statement. However, the commission acknowledges that until renewable power has become even more widespread, “we need to structure consumer contracts in a way that reduces their volatility, and decouples citizens’ energy bills from the prices in short-term wholesale markets”. Therefore, it proposes giving consumers a wider choice of energy contracts and the option to lock in long-term prices. “This will, in practice, reduce their exposure to any price surge,” it explains. It says that people should still be able to choose flexible power contracts for items such as electric cars, to benefit from periods of low electricity prices by charging overnight, for example. Long-term electricity contracts would also be available for large consumers in industry, through power purchase agreements (PPAs), which would guarantee more stable prices. Low-carbon power developers would also benefit from greater stability under the commission’s plans, in the form of contracts for difference (CfDs). The reforms would require any new public financial support for renewables and nuclear power to be in the form of CfDs. Such contracts provide guaranteed revenue to project developers, while member states would be obliged to give back any excess revenue they make from the projects to consumers. The UK government has effectively deployed CfDs to scale up its renewable capacity, but they are not currently widely used across the EU. Summarising its proposals, the commission states: “The ultimate objective is to provide secure, stable investment conditions for renewable and low-carbon energy developers by bringing down risk and capital costs while avoiding windfall profits in periods of high prices.” Back to top How will EU green industry be financed and subsidised? A key goal of the Green Deal Industrial Plan is to “speed up investment and financing for clean tech production in Europe”. The Net Zero Industry Act makes several proposals. These include establishing a Net Zero Industry Platform to “identify bottlenecks and potential best practices” for finance. However, perhaps the most significant financial element of the plan has already been implemented. Following a brief consultation with member states, the European Commission has loosened state aid rules for renewables and other low-carbon projects. This could herald a “subsidy race” as member state governments now have more leeway to pump billions of euros into low-carbon technologies to match the US and other nations. The move has variously been described as a “radical departure” and a “paradigm shift” for the EU. The bloc has traditionally put tight boundaries on national subsidies, to prevent member states from entering into subsidy races with each other. As of 9 March, however, the Temporary Crisis Framework, which was initially set up as a short-term measure to help member states following Russia’s invasion of Ukraine, has been renamed the Temporary Crisis and Transition Framework. This framework allows member states to spend money on “measures needed for the transition towards a net-zero industry” until the end of 2025. However, they will only be allowed to “match” subsidies seen outside the EU, in order to prevent industries leaving the bloc. Accompanying this is a revision of the General Block Exemption Regulation, through which the commission can approve certain categories of state aid. This revision adds key low-carbon sectors, such as hydrogen and zero-emission vehicles, to the list of industries eligible for subsidies. This will allow member states to provide state aid to these sectors without notifying the commission. The new rules have proved controversial. Smaller EU nations raised concerns about harmful competition within the bloc, fearing they could be outgunned by larger and wealthier member states. EU competition chief Margrethe Vestager acknowledged that “European countries are not equal when it comes to state aid”. In the past, subsidy packages have been dominated by the bloc’s larger economies. For example, Germany and France accounted for around 80% of the state aid under the first iteration of the Temporary Crisis Framework. Both countries have been enthusiastic about relaxing state aid rules in response to the US Inflation Reduction Act. Environmental NGOs voiced these concerns about competition within the EU in a joint letter to the commission: “The mere relaxation of state aid rules without substantial additional environmental safeguards and financial mechanisms is likely to lead to further divergence across EU economies, as poorer EU countries may not have the fiscal space for investing in the green transition.” The commission has tried to address some of these concerns – for example, by imposing some restrictions on applications for subsidies in larger EU states. Olivier Vardakoulias, a finance and subsidies policy expert at Climate Action Network Europe, tells Carbon Brief that NGOs are also concerned about the focus of the EU proposals on public subsidy, without equivalent consideration for regulating or directing private funds: “If one provides carrots to EU industry in the form of public subsidies, what are the sticks? Especially for big companies that clearly have access to private finance. There is a question mark there around whether this is the best use of public resources at a time of a cost of living crisis and huge investment needs for green public infrastructure to meet climate, biodiversity and circular economy targets.” Aside from relying on member states to introduce subsidies, the plan mentions “facilitating” the use of existing EU funds, such as those from REPowerEU and InvestEU. Beyond this, NGOs have called for completely new EU funding sources. The commission is working on a proposal to do this, namely a “European Sovereignty Fund”. This will be discussed during the revision of the EU’s multiannual budget this summer and is meant to provide a “structural answer to the investment needs” of the bloc. It is unclear how much money this would entail and where it would come from. Following the launch of the Net-Zero Industry Act, the Financial Times reported on warnings from low-carbon business leaders that the plans “will fail unless they are backed up with more money”. It also noted concerns that the act’s emphasis on using EU-sourced technologies could result in higher prices and lower quality for low-carbon products. Back to top How would the plan create ‘high-skilled jobs’? The third pillar of the commission’s proposed Green Deal Industrial Plan is to create “well-paid quality jobs” in the low-carbon technology sector. This is important because an estimated 35-40% of all jobs in the EU could be “affected” by the transition to net-zero, the commision said in a statement. The Net-Zero Industry Act proposal says that the commission will provide seed funding to support the establishment of “net-zero industry academies”. The aim of these academies will be to develop training and education on how to produce low-carbon technologies and to enhance the skills of the existing workforce in member states, according to the act. It states that EU member states should assess the efficacy of the learning programmes developed by the net-zero industry academies by the end of 2024 and every two years after. The academies should be overseen by a “net-zero Europe platform”, the act says. This platform should also “facilitate closer coordination and the exchange of best practices between member states to enhance the availability of skills in the net-zero industry, including by contributing to Union and member states policies to attract new talents, both from the Union and from third countries”. Back to top How does the plan aim to ensure ‘fair trade’ for ‘green’ businesses? The fourth pillar of the Green Deal Industrial Plan is to ensure that any “green trade” is carried out “under the principles of fair competition and open trade”. It comes after the EU accused the US of flouting World Trade Organization rules with the IRA. (China recently accused the EU of flouting WTO standards with its carbon border adjustment mechanism.) To this aim, the commission will continue to “develop the EU’s network of free trade agreements” to support its net-zero goal, it says. An earlier leaked draft of the Net-Zero Industry Act had some experts concerned that the EU itself may be acting in a protectionist manner with some of its proposed terms. As EurActiv noted in its reporting, the leak stated that, for public procurement, EU authorities should consider the “tender’s contribution to the security of supply”. It further added that security of supply depends on “the proportion of the products originating in third countries”. This could have been interpreted as meaning that authorities will have to consider whether the low-carbon technology they are buying is produced within the EU or not. Such a stipulation could have put the proposal in conflict with the WTO’s Government Procurement Agreement, an expert told EurActiv. However, the final version of the proposal revised the language around public procurement. It instead says that EU authorities should take into account “the proportion of the products originating from a single source of supply” rather than from “third countries”. This can be interpreted as a “positive change” in terms of open trade, says Ignacio Arroniz, a trade and climate researcher at E3G. He tells Carbon Brief: “It’s the difference between saying that you should not depend on any country [outside of the EU] to that you should not depend on one given country…It’s got more of an anti-China feeling to it, but it doesn’t have an ‘anti-every other country’ feel.” (China currently supplies almost all of Europe’s solar PV module imports, as well as around half its battery and EV imports, according to the IEA.) Experts tell Carbon Brief that, overall, the commission’s proposal is framed more around competition with other nations than explicitly boosting climate action. Avantika Goswami, programme manager for climate change at Indian thinktank CSE, tells Carbon Brief that an industrial decarbonisation strategy from the EU is welcome: “With more investment in green industry by the EU, over time those technologies could be deployed more and then over time costs could go down, and that could be made available to the rest of the world…[But] there are a lot of ‘what ifs’ involved in that.” However, she also voices concerns about the impact potentially punitive trade policies could have on industries in global south nations, as they attempt to decarbonise.

पराली से बनेगी दिल्ली की बिजली, NCR के पावर प्लांटों को 30 सितंबर से 5 फीसदी पराली का करना होगा इस्तेमाल

नई दिल्ली: राजधानी दिल्ली में अब पराली से बिजली बनाई जाएगी। सीएक्यूएम (कमिशन फॉर एयर क्वॉलिटी एंड मैनेजमेंट) ने निर्देश जारी किए हैं कि एनसीआर के सभी 11 थर्मल पावर प्लांटों को 30 सितंबर से 5 प्रतिशत पराली का इस्तेमाल ईंधन के तौर पर करना होगा। इसके बाद 31 दिसंबर से इन प्लांटों को 10 प्रतिशत पराली का इस्तेमाल करना होगा। साथ ही इन पावर प्लांटों को धुंआ कम करने के लिए सभी मानकों का पालन भी करना होगा। यह मानक मिनिस्ट्री ऑफ एनवायरनमेंट फॉरेस्ट एंड क्लाइमेट चेंज ने 2015 में नोटिफाई किए थे। सीएक्यूएम के अनुसार कमिशन को इन निर्देशों की पहली एक्शन टेकन रिपोर्ट 30 सितंबर 2023 में सबमिट की जाएगी। इसके बाद यह हर महीने सबमिट होगी। दिल्ली के 300 किलोमीटर दायरे में 11 थर्मल पावर प्लांट चल रहे हैं। सितंबर 2021 में कमिशन ने निर्देश जारी किए थे कि यह प्लांट 5 से 10 प्रतिशत पराली का ईंधन के तौर पर इस्तेमाल करेंगे। तीन दिन पहले ही सीएसई (सेंटर फॉर साइंस एंड एनवायरनमेंट) ने एक रिपोर्ट में दावा किया है कि दिल्ली एनसीआर में कोयले से चलने वाले पावर प्लांट पराली का इस्तेमाल करने में पीछे हैं। रिपोर्ट मे बताया गया है कि ये प्लांट अभी तक इन आदेशों का पालन नहीं कर रहे हैं। इसकी वजह यह है कि पराली की सप्लाई और डिमांड में काफी अंतर है। रिपोर्ट में बताया गया कि पराली के छोटे गट्ठर बनाने वाली यूनिट देश में काफी कम हैं। दिल्ली एनसीआर में इनकी क्षमता 2500 टन प्रति दिन है, जबकि डिमांड लगभग दोगुनी है। रिपोर्ट के अनुसार पावर प्लांट टेंडर में जानबूझकर देरी करते हैं। सरकारी आंकड़ों के अनुसार दिल्ली एनसीआर में 12 मीलियन टन बायोमास गट्ठर के लॉन्ग टर्म टेंडर हुए लेकिन इनमें से 73 प्रतिशत अभी तक जारी नहीं किए गए हैं। इतना ही नहीं 11 प्लांट में से करीब पांच ने पराली गट्ठर की मात्रा का टेंडर काफी कम किया। कुछ पावर प्लांट ने इसे लेकर इलेक्ट्रिसिटी रेगुलेटरी कमिशन ऑफ हरियाणा में अपील भी की थी। सीएसई के इंडस्ट्रियल पल्यूशन के प्रोग्राम डायरेक्टर निवित कुमार यादव ने बताया कि करीब डेढ़ साल से बाद अब यह निर्देश जारी किए गए हैं। मिनिस्ट्री की तरफ से यह नोटिफिकेशन जारी किया गया है। इसमें इन पावर प्लांट को राहत दी गई है। इन्हें दो साल का समय दिया गया है। साथ ही पराली के इस्तेमाल को 5 से 10 प्रतिशत की बजाय पांच प्रतिशत कर दिया गया है।